No details available
No details available
No details available
No details available
No details available
No details available
No details available
FURN/INST (3) NEW BKRS AT ELEC PNL FOR BOILERS CIRCUITS. RUN PIPE/WIRE FROM ELEC PNL TO (3) BOILER LOCATIONS. FURN/INST (1) J-BOX AT EA BOILER FOR SPLICING PURPOSES. WORK PERF'D FOR 600 S DEARBORN CONDO ASSN.
No details available
No details available
No details available
No details available
No details available
No details available
No details available
NO PERMIT WIRING
PROVIDE
OBSTRUCTIONS IN EXIT WAY
CLASS B DOOR IN STAIRWELL
PIPE OPENING W/NONCOMBUST MATL
2HR SEP FOR STORAGE >100SF
1HR PUB.CORRIDOR IN MULT. D.U.
OBTAIN PERMIT BEFORE SIGN WORK
CONNECT VENT LINE
CLUTTER AND DEBRI
CLUTTER AND DEBRI
CONNECT VENT LINE
REPAIR INTERIOR WALLS/CEILING
2-HR STAIR ENCLOSURE, 4+ STORY
REPAIR INTERIOR WALLS/CEILING
CARB MONOX DETECT IN RESID
2-HR STAIR ENCLOSURE, 4+ STORY
CARB MONOX DETECT IN RESID
POST OWNER/MANAGERS NAME/#
FILE BLDG REGISTRATION
NO POSTED ADDRESS
REMOVE