MODERNIZATION OF THREE(3) 3500LB CAPACITY, 10-FLOOR, 500FPM, PASSENGER ELEVATORS(#1-3), AND ONE(1) 3500LB CAPACITY, 12-FLOOR, 500FPM, PASSENGER ELEVATOR(#4), PURSUANT TO THE SCOPE OF WORK SUBMITTED.(EV019157)247 S. STATE ST.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 12/1/2024. END DATE: 12/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
IN-KIND REPLACEMENT OF EXTERIOR WINDOWS AND DOORS IN EXISTING OPENINGS. REPLACEMENT WINDOWS: 60; REPLACEMENT SKYLIGHTS: 0; REPLACEMENT DOORS: 0. AFFECTS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), 18 INTERIOR COMMON AREAS, LOCATION: 2ND AND 3RD FLOOR.
DECEMBER 2, 2023 - DECEMBER 1, 2024
DECEMBER 2, 2023 - DECEMBER 1, 2024
ERECT TWO (2) SCAFFOLDS DATES 6/28/2023 THROUGH 6/28/2024
295 WINDOW REPLACEMENTS WITHIN THE SAME SIZE AND LOCATION PER STRUCTURAL ENGINEER'S DRAWINGS
JULY PERMIT FILING - JULY 2023 - JUNE 2024
TUCKPOINTING - NO STRUCTURAL WORK - 2700 L FT, REPAIR DAMAGED TERRA COTTA, ROUT AND SEAL CRACKS AT 150 LOCATIONS, REMOVE MORTAR AT SILL JOINTS AND INSTALL NEW, APPROX 1400 L FT, 4TH FLR COOPER FLASHING APPROX 250 L FT, WINDOW SEALANTS 1570 L FT, REPAR 55 GRANITE PANEL LOCATIONS, REPAIR 2ND AND 3RD FLR WINDOW FRAMES AND LATICE GRILLS, 1ST FLR DECORATIVE CAST IRON PANELS
ERECT FOUR (4) SCAFFOLDS DATES 12/12/2022 THROUGH 12/12/2023
PERMIT FILING
REPLACE 72 WINDOWS AT EAST ELEVATION FOR DEPAUL UNIVERSITY AT FLRS 2-18
ERECT 2 SCAFFOLDS 6/1/2022 TO 6/1/2023
ERECT ONE (1) SCAFFOLD DATES 04/06/2022 THROUGH 04/06/2023
REPAIR FACADE: TUCKPOINTING (1250 SQ FT) REMOVE/REPLACE (470 SQ FT) OF MASONARY, REPAIR TERRA COTTA 70 LOCATIONS; NO STRUCTURAL WORK.
DEPAUL 12TH & 17TH FL CAT 6A -VOICE DATA CABLING
WINDOWS (REPLACEMENT ONLY): QTY 139 AT N, E, S AND W ELEVATIONS LIGHT COURT AT FLOORS 14 THRU 18 (SAME SIZE AND LOCATION)
ERECT 2 SCAFFOLDS 8/1/2021 TO 8/1/2022
BUILDING MAINTENANCE JULY 2021 - JUNE 2022
JULY 2020-JULY 2021
FACADE REPAIRS INCL. REPAIR APPROX 25 LOCATIONS OF CRACKED TERRA COTTA HEADS, SILLS, AND ASHLARS; TUCKPOINT APPROX 300 SQ FT OF DETERIORATED AND OR CRACKED MORTAR JOINTS IN TERRA COTTA; REPLACE APPROX 250 CRACKED OR DETERIORATED MASONRY (SEPARATE ENVIRONMENTAL PERMIT)
ERECT THREE SCAFFOLDS FROM 3/19/2020 TO 3/19/2021.
REPLACE 372 WINDOWS AT SOUTH ELEVATION FLRS 4-19 EXCLUDING FLOORS 8 & 13 (SAME SIZE AND LOCATION; SAME IN KIND)
JULY 2019 - JUNE 2020
REPLACING 83 WINDOWS ON NORTH ELEVATION OF 18 STORIES SCHOOL(DEPAUL UNIVERSIRTY) REPLACE 5 WINDOWS WEST ELEVATION ONLY.
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION