DDS 2019 CBRC: INTERIOR ALTERATIONS TO GROUND FLOOR LOBBY. WORK TO INCLUDE MEP DEMO, MINIMAL ARCHITECTURAL MODIFICATIONS, MECHANICAL, ELECTRICAL AND PLUMBING UPGRADES (OCCUPANCY A-3, TYPE IB CONSTRUCTION) CONSULTANT REVIEWER: GLOBETROTTERS ENGINEERING
LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL DATA/VIDEO. SPECIFIC LOCATION: MORTON SPECIAL EXHIBITS.
DDS 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING GROUND FLOOR AND FIRST FLOOR SPACE AT EXISTING GALLERY AT THE ART INSTITUTE OF CHICAGO. WORK TO INCLUDE DEMO, NEW PARTITIONS, NEW CEILING, MECHANICAL, ELECTRICAL, AND STRUCTURAL WORK AS PER PLANS. A-3 ASSEMBLY. 1B CONSTRUCTION. CONSULTANT REVIEWER: V3 COMPANIES OF IL
LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 0 . LIGHTING OUTLETS: 150. SPECIFIC LOCATION: MAIN ENTRANCE LOBBY.
LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. ALTER EXISTING DATA/VIDEO. INSTALL OTHER. SPECIFIC LOCATION: EXHIBIT.
SPR 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING SPACE AT EXISTING GALLERY AT THE ART INSTITUTE OF CHICAGO. WORK TO INCLUDE DEMO, NEW PARTITIONS, MECHANICAL AND ELECTRICAL AS PER PLANS. NO PLUMBING OR STRUCTURAL WORK. A-3 ASSEMBLY. 1B CONSTRUCTION
TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 30 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: EAST FACING FACADE AT ROOF LEVEL.
SPR 2019 CBRC: INTERIOR ALTERATIONS TO THE CENTRAL LOBBY ON THE 1ST FLOOR AND WINDOW REPLACEMENT ON THE WEST ELEVATION AT THE 1ST FLOOR AS PER PLANS. (OCCUPANCY GROUP A-3; TYPE 1B CONSTRUCTION)
TEMPORARY SCAFFOLDING: QTY: 1, MAX. LENGTH: 90 FT., MAX. HEIGHT: 65 FT. LOCATION: NORTH ELEVATION. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE
CONCRETE MASONRY REPAIR / REPLACEMNT: 1260SQ. FT., EXCAVATION = NO. LOCATION: LOGIA.
ERECT ONE (1) SCAFFOLD DATES 11/16/2022 THROUGH 11/16/2023
REPAIR IN KIND OF WATERPROOFING, ROOF DECK, STONE RAILING AT ART INSTITUTE ALLERTON BUILDING SOUTH LOGGIA.
REPLACEMENT IN KIND OF ART INSTITUTE'S MORTON WING BRONZE CURTAINWALL FACING THE SOUTH COURTYARD AS PER PLANS.
INFILL TWO OPENINGS, INSTALL NEW CMU BACK AND METAL BAR REINSFORCEMENT AND LIMESTONE MASONRY TO MATCH AT WEST ELEVATION 130 SQ FT AREA AND 260 SQ FT AREA AT GROUND LEVEL OF ART INSTITUTE (ALL TO BE SAME LIKE AND KIND)
INSTALLATION OF 6 ROOF ANCHORS ONLY.
CORNICE & GUTTER REPAIR TO INCLUDE GUTTER, SCUPPER/DOWNSPOUT LININGS, COUNTER FLASHING 1100 LF, DUTCHMAN REPAIRS 60 SQ FT. REQUIRED REPLACE GUTTER STRAINERS, TUCKPOINTING 500 SQ FT, STONE REPAIRS AND MORTAR JOINTS WHERE REQUIRED. REPLACE EAST AND WEST PEDIMENT FLASHINGS. SUBJECT TO FIELD INSPECTIONS. ALL WORK SAME AS EXISTING. QUINTEK ROTEC ABRASIVE CLEANING OF GRANITE STAIRS (ALTERNATE NO. 5) IS NOT APPROVED.
ERECT 1 SCAFFOLD 5/27/19 TO 5/27/2020
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
POST APPROVED OCCUPANCY CARD
POST APPROVED OCCUPANCY CARD
POST APPROVED OCCUPANCY CARD
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
INSTALL EXIT SIGN
POST APPROVED OCCUPANCY CARD
ARRANGE PERMIT INSP.
POST APPROVED OCCUPANCY CARD
POST APPROVED OCCUPANCY CARD
POST APPROVED OCCUPANCY CARD
SEE INSPECTOR COMMENTS
POST APPROVED OCCUPANCY CARD
POST APPROVED OCCUPANCY CARD