HEAT UNIT ADEQUATELY
HEAT UNIT ADEQUATELY
SPR 2019 CBRC. NEW ADDITIONAL DWELLING UNIT IN THE BASEMENT IN EXISTING 2 STORY BRICK BUILDING (3 TOTAL UNITS). MECHANICAL, ELECTRICAL AND PLUMBING INCLUDED. ALL WORK AS PER PLANS**CERTIFIED CORRECTIONS SUBJECT TO FIELD INSPECTIONS & AUDIT **
ARRANGE PREMISE INSPECTION
STOP ODORS RPR DFT SEWAGE SYS
REPLACE DEFECTIVE SOIL PIPING
HEAT UNIT ADEQUATELY
ARRANGE PREMISE INSPECTION
REMOVE STAGNANT WATER BSMT
SOIL/WASTE,VENT PIPE MATRL
200AMP SERVICE WITH 4GANG METER BANK AND PANEL FEEDS
ACCESS TO JBS
APPLIANCE INSIGHT DISCONNECT
PROPER SIZE OCP
DEFECTIVE FIXTURES
EXPOSED WIRING
HEATING PLANT/BOILER ROOM DOOR
DWELLING CLEAN AND SANITARY
INSTALL COVERS
CARB MONOX DETECT IN RESID
DEFECTIVE FIXTURES
SEE INSPECTOR COMMENTS
REMOVE EXPOSED CABLE
1-HR HEATING PLANT ENCLOSURE
INSTALL GFCI'S
EXPOSED WIRING
INSTALL SMOKE DETECTORS
UNAPPROVED CORDS
DEFECTIVE OUTLETS
CONTINUITY OF RACEWAYS
SERVICE WALK, PASSAGE, AREAWAY
REPAIR/REPLACE SMOKE DETECTORS
DEFECTIVE SERVICE
INSTALL ILLUMINATION
INTERIOR FINISH FIRERESISTANCE
REMOVE TEMPS
STOP/REMOVE NUISANCE
PLANS & PERMITS REQ - CONTRCTR
WORK NOT ALLOWED
PROPER SIZE GRD ELECTRODE COND
NO PERMIT WIRING
PROPER SIZE OCP
RMV OBSTRN FROM HSE DRAIN PIPE
LICENSED BONDED PLMBG CONTRCTR
PROVIDE GUTTER & DOWNSPOUT
NO POSTED ADDRESS
ARRANGE PREMISE INSPECTION
ARRANGE PREMISE INSPECTION
REPAIR EAVES
ARRANGE PREMISE INSPECTION