REMOVE DROP CEILING AND REPLACE WITH 5/8 DRYWALL,TAPE,SAND,PRIME,PAINT,INSTALL WATERPROOF FLOORING.
REPAIR AND REPLACE ALL DEFECTIVE PLUMBING PIPING IN BASEMENT AND REPLACE NEW HOSE BIB .ALL WORK DONE IN BASEMENT
CORRECT ELECTRICAL VIOLATIONS NOT INCLUDING THE SERVICE
INSTALL FRONT ENTRY LIGHTS. CORRECT VIOLATIONS IN THE APARTMENTS.
REINSTALL BACK PORCH LIGHTS AFTER REBUILDING NEW PORCH.
REMOVE AND REPLACE EXISTING REAR OPEN WOOD PORCH AND STAIRS AS PER PLAN. SAME SIZE AND LOCATION AS EXISTING.
WORK NOT ALLOWED
ARRANGE PREMISE INSPECTION
PLANS & PERMITS REQ - CONTRCTR
SERVICE WALK, PASSAGE, AREAWAY
REPAIR PORCH SYSTEM
DEBRIS, EXCESSIVE
REPAIR EXTERIOR WALL
STOP/REMOVE NUISANCE
REPAIR EXTERIOR DOOR SILL
PROVIDE
SERVICE WALK, PASSAGE, AREAWAY
REPAIR FENCE
ARRANGE PREMISE INSPECTION
REPAIR EXTERIOR DOOR HARDWARE
REPAIR INTERIOR WALLS/CEILING
WORK NOT ALLOWED
REPAIR PORCH SYSTEM
REPAIR EXTERIOR DOOR
REPAIR EXTERIOR STAIR
PLANS & PERMITS REQ - CONTRCTR