ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 2/27/2026. END DATE: 2/27/2027. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 2/27/2026. END DATE: 2/27/2027. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 2/17/2025. END DATE: 2/17/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 1900 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. CONCRETE MASONRY REPAIR / REPLACEMNT: 80SQ. FT., EXCAVATION = NO. LOCATION: WEST ELEVATION.
TEMPORARY SCAFFOLDING: QTY: 1, MAX. LENGTH: 90 FT., MAX. HEIGHT: 58 FT. LOCATION: WEST ELEVATION. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE THIS PERMIT IS NOT VALID WITHOUT CORRESPONDING CDOT PUBLIC WAY PERMIT.
JULY, AUGUST, & SEPTEMBER MAINTENANCE
APRIL, MAY AND JUNE MAINTENANCE
DECEMBER PERMIT FILING
OCTOBER, NOVEMBER AND DECEMBER MAINTENANCE
OCTOBER, NOVEMBER AND DECEMBER MAINTENANCE
FACADE REPAIRS: ROUTE & SEAL CRACKS 16-55LF, TUCKPOINTING 2700SQFT., REMOVE/REPLACE FACE BRICKS, RESEAL 100% OF WINDOW FRAMES/FACADE JOINTS 1200LF. - NO STRUCTURAL WORK - 1 SQFT
JULY, AUGUST, AND SEPTEMBER MAINTENANCE
APRIL, MAY AND JUNE MAINTENANCE
JANUARY, FEBRUARY AND MARCH MAINTENANCE
OCTOBER, NOVEMBER AND DECEMBER MAINTENANCE
JUNE PERMIT FILING - JULY, AUGUST AND SEPTEMBER MAINTENANCE
CAB INTERIOR MODERNIZATION ONLY ON ONE (1) 3000LB.CAP, 6-FLOORS, 200 FPM, GEARED TRACTION PASSENGER ELEVATOR #2. PURSUANT TO THE SCOPE OF WORK SUBMITTED.
ERECT TWO (2) SCAFFOLD DATES 06/08/2022 THORUGH 06/08/2023
FACADE REPAIRS
APRIL, MAY AND JUNE MAINTENANCE
JANUARY, FEBRUARY, AND MARCH MAINTENANCE
OCTOBER, NOVEMBER AND DECEMBER MAINTENANCE
POST CURRENT CERTIF PLAT LIFT
ERECT ONE(1) SCAFFOLD FROM 06/08/2021 TO 06/08/2021.
JULY, AUGUST AND SEPTEMBER MAINTENANCE
ROUT AND SEAL CRACKS 15 L FT, TUCK POINT 1500 SQ FT; REPLACE WINDOW SEALANT 750 L FT
APRIL, MAY, AND JUNE MAINTENANCE.
JANUARY, FEBRUARY, AND MARCH MAINTENANCE
OCTOBER, NOVEMBER AND DECEMBER MAINTENANCE
JULY, AUGUST AND SEPTEMBER MAINTENANCE
APRIL, MAY AND JUNE MAINTENANCE.
JANUARY, FEBRUARY, AND MARCH MAINTENANCE
OCTOBER, NOVEMBER AND DECEMBER MAINTENANCE.
JULY, AUGUST AND SEPTEMBER MAINTENANCE
ERECT ONE SCAFFOLD FROM 06/24/2019 TO 6/24/2020.
TUCKPOINT (1540LF). REPLACE MASONRY (200SF). PATCH SPALLED LIME STONE (15SF). ROUT & SEAL CRACKS IN LIMESTONE (50LF). REPLACE WINDOW SEALANT (250LF)- (NO STRUCTURAL WORK)- ALL WORK SAME AS EXISTING; SUBJECT TO FIELD INSPECTIONS
JULY, AUGUST, AND SEPTEMBER MAINTENANCE.
PRV HIGH SIDE
OBTAIN REFRIGERATION PERMIT
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINT PLATFORM LIFT
MAINT PLATFORM LIFT
MAINTAIN OR REPAIR ELECT ELEVA
USE NEW BOLTS OR RODS