No details available
RT-4 REMODEL EXITING KITCHEN IN UNIT #2. REPLACE SINK, INSTALL NEW EXHAUST HOOD AND INSTALL NEW ELECTRICAL SWITCHES AND LIGHTING AND KITCHEN CABINETS PER PLANS.
INTERIOR REMODEL OF UNIT NO. 2 (2ND &3RD FLRS) REPLACE BROKEN WINDOWS, REPLACE EXTERIOR DOOR, REMODEL FULL BATH INTO POWDER RM; REPLACE KITCHEN SINK AND FAUCET; REPAIR DRYWAL AND TILE AS NEEDED (FLOOR LAYOUT TO REMAIN THE SAME) SEPARATE ELECTRICAL PERMIT
REMODEL EXISTING ELECTRIC AT 3RD FLOOR KITCHEN AND BATH, PLUS 2ND FLOOR MATER BEDROOM.