REPLACEMENT OF CYLINDER ON ONE(1) 2000LB CAPACITY, 2-FLOOR, 125FPM, PASSENGER ELEVATOR, PURSUANT TO THE SCOPE OF WORK SUBMITTED.(EV002186)
SWAP OUT THE EXISTING 100-AMP PANEL IN 3RD FLOOR CONDO UNIT WITH A SPAN PANEL 125-AMP MAIN CIRCUIT BREAKER, REPLACE THE 100-AMP BREAKER IN THE METER MAIN WITH A 125-AMP BREAKER, REPLACE THE EXISTING SERVICE WIRES BETWEEN THE METER AND THE LOAD CENTER WITH #2 THHN WIRE.
No details available
REMODEL KITCHEN IN PLACE - REPLACE FIXTURES, CABINETS AND APPLIANCES. MINOR ELECTRIC. INSTALL NEW WINDOWS AND DOORS IN ENLARGED MASONRY OPENINGS IN 3 STORY TIMBER FRAME R2 MULTI UNIT BUILDING.
No details available
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
RESTORE THREE LINTELS ON NORTH ELEVATION UNDER 6', TUCKPOINT TO MATCH EXISTING 1000 SQFT. (SEPARATE ENVIRONMENTAL PERMIT FOR GRINDING)
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA