MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
TUCKPOINTING - NO STRUCTURAL WORK - 4000 SQFT EAST ELEVATION, CONCRETE REPAIRS, APPLY WATER RESISTANT COATING.
2019 SPR: NEW FIRE-RATED ENCLOSURE AT EXISTING OPEN STAIRWELL IN EXISTING 7 STORY TYPE 1B BUILDING CONTAINING 68 DWELLING UNITS, AS PER PLANS.
MASONARY & CAULKING REPAIRS.
ERECT ONE (1) SCAFFOLD DATES 07/21/2022 THROUGH 07/21/2023
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
OWNER OR LICENSED CONTRACTOR
LEAKING BOILER TUBES
DEFECTIVE STAY BOLTS
REMOVE EXISTING ROOF AND INSTALL NEW TAPERED INSULATION, COVER BOARD AND TWO PLY MODIFIED ROOFING APPRX 5000SQFT
ERECT 2 SCAFFOLDS 5/7/2019 TO 5/7/2020
MASONRY REPAIR WORK ALL ELEVATIONS: REPLACE LINTELS, REBUILD PARAPET WALL, BRICK REPLACEMENT AND TUCKPOINTING- (NO STRUCTURAL WORK)- ALL WORK SAME AS EXISTING; SUBJECT TO FIELD INSPECTIONS
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
SEND EX. METAL LETTER
INSTALL ACCESS COVER PASS