REMOVE EXISTING COFFEE EQUIPMENT AND REPLACE WITH NEW EQUIPMENT AND RELOCATE TWO 30 AMP AND THREE 20 AMP RECEPTACLES
No details available
PRV RECEIVER
ARRANGE FOR RE-INSPECTION
ARRANGE FOR RE-INSPECTION
PRV RECEIVER
ACCESS TO ROOF
ACCESS TO ROOF
ARRANGE FOR INSPECTION
ARRANGE FOR INSPECTION
PRV RECEIVER
BLOCKED FIRE DOOR
WORKING SPACE
FIRE EXTNGSHR RECHARGE & TAG