No details available
INSTALL NEW LAUNDRY GRAY BOX FOR WASHING MACHINE CONNECTION AND INSTALL ALL ASSOCIATED D,W,V AND WATER PIPINGFOR UNIT 4C ONLY
TUCKPOINT AS NECESSARY & CAULK(200 SQ FT) ON EAST ELEVATION.ALL WORK SAME AS EXISTING.
No details available
SOUTH ELEVATION, TUCKPOINT AS NECESSARY & REPLACE 50 BRICKS 1000SQFT. ALL WORK SAME AS EXISTING.
SOUTH ELEVATION,TUCKPOINT AS NECESSARY & REPLACE (100)BRICKS(1000 SQ FT)ALL WORK SAME AS EXISTING.
No details available
REMOVE EXISTING ROOFING MATERIAL AND REPLACE THE SAME IN KIND.NO STRUCUAL WORK.
No details available
No details available
No details available
ARRANGE PREMISE INSPECTION
REPAIR EXTERIOR WALL
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
REP/REPL DEF ALARM BELL PASS
POST CURRENT CERTIF PASS ELE
ENCLOSE MACH/RM 2 HR FIRE
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
COLLECT OIL LEAKING FR PACKING
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION