TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 750 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: FRONT FACADE, BACK FACADE.
RESTORE EXIT AND EM
GRINDING & TUCKPOINTING(750 SQ FT),CAULKING AND WINDOW LITEL REPLACEMENT(COUNTRY YARD FACING EAST AND SOUTH)17LINTELS,4'- 6'LONG,6" X 4" LONG,6" X 4' X 3/8".ALL WORK SAME AS EXISTING.
TUCKPOINT (750 SQ FT). CAULKING. REPLACE 6FT LONG LINTEL AT EAST ELEVATION (NO STRUCTURAL WORK)- ALL WORK SAME AS EXISTING; SUBJECT TO FIELD INSPECTIONS
TUCKPOINTING - NO STRUCTURAL WORK - 750 SQFT
ERECT TWO (2) SCAFFOLDS DATES 9/14/2021 THROUGH 9/14/2022
TUCKPOINTING(750 SQ FT), SEALING, NEW WALL TIES INSTALLATION, CAULKING, BACK-UP WALL REPAIR, RESET LIMESTONE WINDOW SILLS; ALL WORK SAME AS EXISTING - NO STRUCTURAL WORK - SEPARATE ENVIRONMENTAL PERMIT FOR GRINDING
ERECT ONE(1) SCAFFOLD FROM 08/13/2020 TO 08/13/2021.
ERECT 1 SCAFFOLD FROM 05/31/2019 TO 05/31/2020.
No details available
No details available
HOISTNG OVER PUB WAY NO PERMIT
EMPLOYER NO CRANE LISC
EMPLOYER NO CRANE LISC
HOISTNG OVER PUB WAY NO PERMIT
ARRANGE FOR RE-INSPECTION
ARRANGE COMPLETED PERMIT INSP.
SEND EX. METAL LETTER
OPEN TYPE VIOLATION
PROVIDE SUPPLY
OPEN TYPE VIOLATION
PROVIDE MINIMUM VENT QUANTITY
OUTSIDE AIR 15FT
GIVE VENT OPENINGS % FL. AREA
ARRANGE COMPLETED PERMIT INSP.
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
OPEN TYPE VIOLATION
INST XHEAD ROPE DATA PLATE P