ARRANGE FOR REINSPECTION REGAR
DDS 2019 CBC: INTERIOR ALTERATIONS TO 15 DWELLING UNITS IN EXISTING 4 STORY MASONRY BUILDING. TYPE III-A CONSTRUCTION, OCCUPANCY R-2. ALL AS PER PLANS. CONSULTANT REVIEWER: V3 COMPANIES OF IL
CHIMNEY
EXPOSED WIRING
REPAIR EXTERIOR WALL
REPAIR EXTERIOR DOOR HARDWARE
ARRANGE PREMISE INSPECTION
PARAPET
ILLUMINATE EXIT AREAS
POST OWNER/MANAGERS NAME/#
SEE INSPECTOR COMMENTS