SPR 2019 CBRC - CONVERT THE EXISTING TYPE IIIA 3 STORY MASONRY BUILDING FROM 6 TO 7 DWELLING UNITS BY MAKING ONE OF THE BASEMENTS AND FIRST FLOOR DUPLEX UNITS INTO SIMPLEX DWELLING UNITS. NO WORK TO BE PERFORMED TO THE SECOND AND THIRD FLOOR AND THE SIX PARKING SPACES AT THE REAR OF THE PROPERTY WILL REMAIN, AS PER PLANS. R2 OCCUPANCY CLASSIFICATION. ZBA GRANTED ON 7/22/2024 FOR REDUCTION OF PARKING. **CERTIFIED CORRECTIONS SUBJECT TO FIELD INSPECTIONS & AUDIT **
No details available
ARRANGE FOR RE-INSPECTION
REVISION TO PERMIT #100644386: NEW PARTITIONS, ELECTRICAL, AND HVAC SYSTEMS FOR (2) EXISTING FINISHED DUPLEXED BASEMENT UNITS IN EXISTING 3-STORY, 6 D.U. 3B MASONRY BUILDING, PER PLAN.**CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS.
ARRANGE COMPLETED PERMIT INSP.