SCOPE: NONSTRUCTURAL INTERIOR WORK: ADD 2 SCONCES IN 3RD AND 4TH FLOOR BATHROOMS, REPLACE PLUMBING FIXTURES WITH ASSOCIATED PIPING IN 3RD AND 4TH FLOOR BATHROOMS. REPLACE JACUZZI WITH STANDARD TUB IN 4TH FLOOR BATHROOM. INSTALL MIXING VALVES IN BATHROOM/SHOWER. LOCATIONS: 1 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), UNIT 3 ONLY
REPAIR EXTERIOR STAIR
ARRANGE PREMISE INSPECTION
1HR FLR OVER BSMT, 1 OR 2 DU