CPS SCHOOL PROJECT: NO CHANGE IN OCCUPANCY/USE (CURRENT OCCUPANCY: SCHOOL/E1; CURRENT CONSTRUCTION TYPE 1-B) SELF-CERT 2019 IBC. RENOVATION OF EXISTING SCHOOL BUILDING INCLUDING INTERIOR FINISHES FOR NEW DIGITAL MAKERSPACE AND UPDATE SCIENCE LAB.
SELF-CERT 2019 CBRC, CHICAGO PUBLIC SCHOOL, GROUP E-1 EDUCATIONAL, NO CHANGE IN USE, TOTAL ROOF AND METAL COPING REPLACEMENT AND REPAIR OF DAMAGED INTERIOR FINISHES DUE TO WATER INFILTRATION. TARGETED MASONRY TUCKPOINTING. REPLACEMENT OF A CHILLER AND A ROOFTOP UNIT.
-EXISTING CPS SCHOOL: RUBBER SURFACE AND GRASS AREA REMOVAL TO PROVIDE NEW PLAYLOT. ASPHALT PAVEMENT MILLING AND RESURFACING FOR 3 ADA STALLS WITH STRIPING. SEALCOATING OF PAVEMENT FOR PARKING STALL STRIPING. GRASS AND WOODCHIP AREA REMOVAL TO PROVIDE NEW BASKETBALL COURT ON HMA PAVEMENT.-NO CHANGE IN USE.
CPS SCHOOL WITH NO CHANGE IN USE: INTERIOR RENOVATIONS TO 2 EXISTING CLASSROOMS, ELECTRICAL RECEPTACLE REPLACEMENT IN KIND.
OWNER OR LICENSED CONTRACTOR
INTERNAL
INTERNAL
REPLACE
OWNER OR LICENSED CONTRACTOR
INTERNAL
OWNER OR LICENSED CONTRACTOR
INTERNAL
OWNER OR LICENSED CONTRACTOR
INTERNAL
INTERNAL
INTERNAL
OWNER OR LICENSED CONTRACTOR
INTERNAL
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
INTERNAL
OWNER OR LICENSED CONTRACTOR
INTERNAL
OPEN TYPE VIOLATION
REP/REPL DEF ALARM BELL PASS