SPR 2019 CBC: FULL BUILDING PERMIT FOR 2 STORY + 4 UNIT BUILDING. RENOVATE AND BUILDING (OCCUPANCY GROUP R-2, TYPE IIIA CONSTRUCTION)
OPEN
REPLACE FIXTURES AND DEVICES MJ
4 UNITS:REMOVE/REPLACE 3 EXISTING WINDOWS, 4 EXT. DOORS, 10 INT. DOORS, PLUMBING FIXTURES WITH ASSOCIATED PIPING , KITCHEN CABINETS, APPLIANCES(4REFRIG., 4DISHWASHER, 4STOVES, 4MICROWAVES). REFINISH HARDWOOD FLOORS AND PAINT ALL ROOMS.
POST OWNER/MANAGERS NAME/#
REPAIR EXTERIOR WALL
ARRANGE PREMISE INSPECTION
REPAIR LINTELS