SPR 2019 CBRC INTERIOR ALTERATIONS TO EXISTING 2-STORY, 2 DWELLING UNIT BUILDING TO FINISH EXISTING BASEMENT. MECHANICAL, ELECTRICAL, AND PLUMBING ALTERATIONS PER PLANS. (OCCUPANCY GROUP R-5; TYPE IIIB CONSTRUCTION)
No details available
VACANT BUILDING - REGISTER
CUT OR REMOVE HIGH WEEDS
REPAIR WINDOW SILLS
PRV CAST IRON COVER FOR BASIN
REPAIR COPING
INSTALL SMOKE DETECTORS
ARRANGE PREMISE INSPECTION
REPAIR INTERIOR STAIR SYSTEM
REPAIR EXTERIOR WALL
INSECTS
ROACHES
PRV CAST IRON COVER FOR BASIN
RMV OBSTRN FROM HSE DRAIN PIPE
SUPPLY HOT WTR MIN TEMP 120DEG
REPAIR BALCONY
WORK NOT ALLOWED
PLANS & PERMITS REQ - CONTRCTR
PRV CAST IRON COVER FOR BASIN
REPAIR LINTELS
REPAIR EXTERIOR WALL
REPAIR/REBUILD GARAGE OR SHED