REPAIR (26% TO 50%) FOR WOOD PORCH (OPEN) (QUANTITY: 1, LOCATION: FRONT OF BUILDING). LANDING: 48 SQUARE FEET. LANDING NOT MORE THAN 6 FEET ABOVE GROUND.
REPAIR PORCH SYSTEM
REPAIR DOWNSPOUT
REPAIR EXTERIOR WALL
REPAIR PORCH SYSTEM
CHIMNEY
REPAIR DOWNSPOUT
MAINTAIN WINDOW
REPAIR ROOF
REPAIR EXTERIOR WALL
CHIMNEY
MAINTAIN WINDOW
REPAIR ROOF
SAFE WORKING CONDITIONS
HEAT UNIT ADEQUATELY
UNAPPROVED HEATING DEVICE
SAFE WORKING CONDITIONS
HEAT UNIT ADEQUATELY
ARRANGE PREMISE INSPECTION
REPAIR DOWNSPOUT
MAINTAIN WINDOW SASH
REPAIR EXTERIOR WALL
REPLCE WINDOW PANES, PLEXGLAS
No details available
HEAT UNIT ADEQUATELY
HEAT UNIT ADEQUATELY
RELOCATE SMOKE DETECTOR
SAFE WORKING CONDITIONS
UNAPPROVED HEATING DEVICE
PERMIT REQUIRED - CONTRACTOR
MAINTAIN WINDOW
POST OWNER/MANAGERS NAME/#
REPAIR WINDOW SILLS
REPAIR PORCH SYSTEM
MAINTAIN WINDOW SASH
WORK NOT ALLOWED
SCREEN OUTER DOORS, WINDOWS
REPAIR EXTERIOR STAIR
INSTALL SMOKE DETECTORS
REPLCE WINDOW PANES, PLEXGLAS
HEAT UNIT ADEQUATELY
REPAIR/REPLACE SMOKE DETECTORS
UNAPPROVED HEATING DEVICE
CARB MONOX DETECT IN RESID
SAFE WORKING CONDITIONS