SPR 2019 CBC. ADU NORTH ZONE. CONVERT PROPERTY FROM 7 DU TO 8 DU (NO WORK AT EXISTING 7 DU AT BSMT/1ST/2ND/3RD FLOORS) FOR THE 3 STORY TYPE IIIA BRICK BUILDING WITH A BASEMENT (USE GROUP R-2), AS PER PLANS.
REPAIR EXTERIOR STAIR
NO KEY TO USE EXIT DOOR
ARRANGE PREMISE INSPECTION
REPAIR/REBUILD GARAGE OR SHED
FILE BLDG REGISTRATION
ARRANGE PREMISE INSPECTION
PROVIDE GUARD RAIL 42 IN HIGH
REPAIR/REBUILD GARAGE OR SHED
PROVIDE GUARD RAIL 42 IN HIGH
FLAKY INTERIOR PAINT
REPAIR WINDOW SILLS
SERVICE WALK, PASSAGE, AREAWAY
REPAIR EAVES
INT WALL/CEILING PEELING PAINT
REPAIR EXTERIOR WALL
NO BARBED WIRE ON FENCE < 8FT
REPAIR OR REPLACE