No details available
PERMIT EXPIRES ON 05/13/2026 ERECTION STARTS: 4/2/2026, ERECTION ENDS: 4/2/2026. CBC 2019 - MOBILE STAGE FOR THE 2026 WHITE SOX OPENING DAY TAILGATE PARTY AT GUARANTEED RATE FIELD PARKING LOT ON APRIL 2. SETUP AND TAKEDOWN IS APRIL 2, 2026. 1-24X20 SL-100 MOBILE STAGE WITH WINGS. CHICAGO WHITE SOX WITH SOUND SOLUTION GROUP INC.
PERMIT EXPIRES ON 05/13/2026 ERECTION STARTS: 4/2/2026, ERECTION ENDS: 4/2/2026. CBC 2019 - MOBILE STAGE FOR THE 2026 WHITE SOX OPENING DAY TAILGATE PARTY AT GUARANTEED RATE FIELD PARKING LOT ON APRIL 2. SETUP AND TAKEDOWN IS APRIL 2, 2026. 1-24X20 SL-100 MOBILE STAGE WITH WINGS. CHICAGO WHITE SOX WITH SOUND SOLUTION GROUP INC.
PERMIT EXPIRES ON 04/27/2026 ERECTION STARTS: 3/11/2026, ERECTION ENDS: 9/7/2026. CHICAGO WHITE SOX 2026 SEASON- CHISOX BAR & GRILL- CANOPIES CANOPIES- REINSTATE 100958558- 180 DAY EVENT (3/11/25 - 9/7/26) ERECT TWO (2) 20X45 FRAME CANOPIES. ERECT 03/11/26- REMOVE 9/7/26ASSEMBLY
PERMIT EXPIRES ON 04/27/2026 ERECTION STARTS: 3/11/2026, ERECTION ENDS: 9/7/2026. CHICAGO WHITE SOX 2026 SEASON- CHISOX BAR & GRILL- CANOPIES CANOPIES- REINSTATE 100958558- 180 DAY EVENT (3/11/25 - 9/7/26) ERECT TWO (2) 20X45 FRAME CANOPIES. ERECT 03/11/26- REMOVE 9/7/26ASSEMBLY
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 1/13/2026. END DATE: 7/12/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 10/7/2025. END DATE: 1/5/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
PERMIT EXPIRES ON 11/04/2025 ERECTION STARTS: 9/19/2025, ERECTION ENDS: 9/19/2025. CBC 2019 - MOBILE STAGE FOR THE SEPTEMBER 2025 MODELO TAILGATE PARTY AT GUARANTEED RATE FIELD PARKING LOT ON SEPT 19. SETUP AND TAKEDOWN SEPT 19, 2025.1-24X20 SL-100 MOBILE STAGE WITH WINGS. CHICAGO WHITE SOX WITH PATINOS MUSIC.
PERMIT EXPIRES ON 10/01/2025 ERECTION STARTS: 8/14/2025, ERECTION ENDS: 8/16/2025. SAVANNAH BANANAS @ CHICAGO WHITE SOX FIELDMOBILE STAGE- 2 DAY EVENT- AUGUST 15-16, 2025 ERECT ONE (1) MOBILE STAGE 33X22X21, 4 DECKSETUP 8/14/2025- REMOVE 8/16/2025, ASSEMBLY
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 7/8/2025. END DATE: 10/6/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
No details available
PERMIT EXPIRES ON 07/22/2025 ERECTION STARTS: 6/6/2025, ERECTION ENDS: 6/6/2025. CBC 2019 - MOBILE STAGE FOR THE MODELO TAILGATE PARTY AT GUARANTEED RATE FIELD PARKING LOT. 1-24X20 SL-100 MOBILE STAGE WITH WINGS. CHICAGO WHITE SOX WITH SOUND WORKS PRODUCTION INC.
LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 4 . LIGHTING OUTLETS: 2. SPECIFIC LOCATION: SOUND.
No details available
LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: TV TRUCK DOCK AND MISC MECHANICAL ROOMS.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 4/4/2025. END DATE: 7/3/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
No details available
No details available
REPLACEMENT OF HANDRAILS, STEP CHAINS, AND SAFETY SWITCHES DUE TO WATER DAMAGE ON FOUR(4) ESCALATORS, PURSUANT TO THE SCOPE OF WORK SUBMITTED.(EV011856)
LED INTERNALLY ILLUMINATED FACE LIT LETTER/LOGO SET READING "RATE FIELD WITH LOGO
OTHER ADMINISTRATIVE CHANGE ASSOCIATED WITH PERMIT B200410823. DETAILS: CHANGE CONTACT INFORMATION. ADMINISTRATIVE FILING ONLY. NO SUBSTANTIVE CHANGE TO SCOPE OF PERMIT B200410823.
REPLACEMENT OF HOIST CABLES ON TWO(2) 3500LB CAPACITY, 5-FLOOR, 350FPM, PASSENGER ELEVATORS(#12, #13), PURSUANT TO THE SCOPE OF WORK SUBMITTED.(EV011856)
PERMIT EXPIRES ON 04/20/2025 ERECTION STARTS: 3/6/2025, ERECTION ENDS: 9/2/2025. CHICAGO WHITE SOX- GAME CHANGER SEASON CANOPIES CANOPIES- REINSTATE 100958558- 180 DAY EVENT (3/6/25 - 9/2/25) ERECT TWO (2) 20X45 FRAME CANOPIES. ERECT 03/06/25- REMOVE 9/02/25ASSEMBLY
SELF-CERT 2019 CBRC: TENANT BUILDOUT OF 7,560 SQ FT INTERIOR SPACE AND 1588 SQ FT EXTERIOR DECK FOR VIDEO PRODUCTION AND FAN VIEWING ON THE FOURTH FLOOR OF AN EXISTING 5 STORY STADIUM BUILDING. THE RENOVATION INCLUDES THE DEMOLITION AND REWORKING OF A PORTION OF THE CURRENT TENANT SPACE. NEW WORK INCLUDES; NEW STUDIO, CONTROL ROOM, EQUIPMENT ROOM, FAN VIEWING LOUNGE AND RECONFIGURED EXISTING OFFICE AREA. AN ADDITIONAL ELECTRICAL ROOM WILL BE ADDED TO SUPPORT VIDEO PRODUCTION REQUIREMENTS. NEW LI
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
FIRE ALARM: REPAIR EXISTING SYSTEM. AFFECTS: 0 DWELLING UNITS; 0 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: YES. VOICE COMMUNICATION: YES. SPECIAL LOCKING: NO. MONITORING TYPE: SUPERVISING STATION . SPECIFIC LOCATION: 10 SECTIONS.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 1/7/2025. END DATE: 4/7/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 11/6/2024. END DATE: 1/5/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
MONTHLY MAIN FOR SEPTEMBER 2024
PERMIT EXPIRES ON 10/29/2024 ERECTIOERECTION STARTS: 9/14/2024, ERECTION ENDS: 10/31/2024. CHICAGO WHITE SOX- GAME CHANGER SEASON CANOPIESCANOPIES- REINSTATE 100958558- 47 DAY EVENT (9/14/24 - 10/31/24) ERECT TWO (2) 20X45 FRAME CANOPIES. ERECT 09/14/24- REMOVE 10/31/24ASSEMBLY
No details available
MONTHLY MAIN FOR AUGUST 2024
MAINTENANCE FOR JULY 2024
PERMIT EXPIRES ON 09/10/2024 ERECTION STARTS: 7/19/2024, ERECTION ENDS: 7/21/2024. SELF CERT CBC2019. REINSTATEMENT OF 2023 PERMIT 101022984 FOR THE 2024 FORD DRIVING SKILLS TENT EVENT IN THE NORTH PARKING LOT AT GUARANTEED RATE FIELD ON JULY 20-21. SAME 1-40X80 FRAME TENT AND 3-20X40 FRAME TENTS. EVENTLINK WITH INDESTRUCTO RENTAL CO INC.
POST APPROVED OCCUPANCY CARD
MAINTENANCE FOR JUNE 2024
MONTHLY MAINTENANCE FOR MAY 2024
PERMIT EXPIRES ON 07/01/2024 ERECTION STARTS: 5/2/2024, ERECTION ENDS: 5/5/2024. KIA ANTI-THEFTTENT-SELF-CERT- 2 DAY EVENT (5/3-4/2024) ERECT ONE (1) 20X50 (6MX15M) STRUCTURE TENT. ERECT 5/2/2024, REMOVE- 5/5//2024ASSEMBLY
PERMIT EXPIRES ON 06/26/2024 ERECTION STARTS: 5/2/2024, ERECTION ENDS: 5/5/2024. KIA ANTI-THEFTTENT-2 DAY EVENT (5/3-4/2024) ERECT ONE (1) 40X66 (12MX20M) STRUCTURE TENT. ERECT 5/2/2024, REMOVE- 5/5//2024ASSEMBLY
MAINTAIN OR REPAIR ESCALATOR
PERMIT EXPIRES ON 06/08/2024 ERECTION STARTS: 5/2/2024, ERECTION ENDS: 5/6/2024. VERDE EVENTSTENT-PEER REVIEW- REINSTATE 101035393- 3 DAY EVENT (5/3-5/2024) ERECT ONE (1) 40X110 (12MX33M) STRUCTURE TENT. ERECT 5/2/2024, REMOVE- 5/6//2024ASSEMBLY
MONTHLY MAIN FOR APRIL 2024
MONTHLY MAIN FOR THE MONTH OF MARCH 2024
**FIRE ALARM PERMIT**REPLACE ALL FIRE PANELS
**FIRE ALARM PERMIT**INSTALLATION OF FIRE DEVICES - REPLACEMENT
MAINTAIN OR REPAIR ELECT ELEVA