REPLACE HOIST ROPES ON ONE (1) 2500LB.CAP, 7-FLOOR, GEARED TRACTION PASSENGER ELEVATOR #1. PURSUANT TO THE SCOPE OF WORK SUBMITTED. EV010021
TUCKPOINTING 3000 SQ FT, REPLACE (200 DETERIRATED BRICKS)
REPAIR PARAPET WALL,REPLACE(25)DETERIORED BRICKS,REPOINT CRACKS.TUCKPOINTING - NO STRUCTURAL WORK - 1000 SQFT
REPLACE 4 ROOF TOP UNITS AND 1 MAKK-UP AIR UNIT
REPLACE THREE CHILLERS, ONE RTU, AND FOUR CONDENSING UNITS WITH TWO 190 TON SCREW CHILLERS, ONE 30 TON SCROLL CHILLER, ONE 5 TON RTU, AND FOUR 15 TON REMOTE CONDENSING UNITS, ALL UNITS LOCATED ON THE ROOF, AND SERVING A MULTI DWELLING UNIT BUILDING.
ROOFTOP DECK LIGHTING
No details available
No details available