655 W Irving Park Rd, Chicago, IL, 60613 · Chicago · 22 total events
REPAIR OR IN-KIND REPLACEMENT OF 0 PLUMBING FIXTURES AS DESCRIBED IN PERMIT APPLICATION. INCLUDES REPAIR OR REPLACMENT OF PLUMBING PIPING. INCLUDES REPAIR OR REPLACEMENT OF PLUMBING RISERS IN EXISTING CHASES. LOCATIONS: 6 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), UNITS 2913 / 3013 / 3113 / 3213 / 3313 / 3413.
MODERNIZATION OF THREE(3) 2000LB CAPACITY, 28-FLOOR, 450FPM, PASSENGER ELEVATORS(LOW RISE #1-3); THREE(3) 2000LB CAPACITY, 55-FLOOR, 700FPM, PASSENGER ELEVATORS(HIGH RISE #4-6); AND TWO(2) 2500LB CAPACITY, 57-FLOOR, 500FPM, PASSENGER ELEVATORS(#7-8 SERVICE), PURSUANT TO THE SCOPE OF WORK SUBMITTED.(EV002894)
CONCRETE MASONRY REPAIR / REPLACEMNT: 900SQ. FT., EXCAVATION = NO. LOCATION: EXTERIOR FACADE.
TEMPORARY SCAFFOLDING: QTY: 2, MAX. LENGTH: 40 FT., MAX. HEIGHT: 500 FT. LOCATION: EXTERIOR FACADE. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE
SPR 2019 CBRC: INTERIOR ALTERATIONS TO ADDRESS OPEN VIOLATIONS FOR WORK ON 56TH FLOOR OF EXISTING. BUILDING. NO CHANGE TO OCCUPANCY. (OCCUPANCY GROUP: R-2, M, B; TYPE IIIA CONSTRUCTION)
CONCRETE MASONRY REPAIR / REPLACEMNT: 1500SQ. FT., EXCAVATION = NO. LOCATION: PARKING GARAGE.
SPR 2019 CBRC: INTERIOR ALTERATIONS TO 1ST FLOOR TENANT SPACE # CO-1, TO CONVERT EXISTING RELIGIOUS ASSEMBLY TO COFFEE SHOP (RESIDENTIAL SUPPORT SERVICES FOR CZO) , EXISTING AND PROPOSED TENANT USE GROUP B.FOR EXISTING MIXED USE (901 DU), 56 STORY BUILDING, NON-SPRINKLERED IA CONSTRUCTION**CERTIFIED CORRECTIONS SUBJECT TO FIELD INSPECTIONS & AUDIT **
INSTALL 2 OUTLETS AND LIGHT FIXTURES
SEALANT REPLACEMENT - 2,000LF, CONCRETE PATCHING - 925SF, ROUTE/SEAL CRACKS - 1,000LF; SUBJECT TO FIELD INSPECTIONS
CHANGE 9 EXISTING REGULAR STYLE OUTLETS FOR BRAND NEW GFCI OUTLETS AT THE KITCHEN AREA.
ERECT ONE (1) SCAFFOLD DATES 06/05/2023 THROUGH 06/05/2024
INSTALL NEW 20A GFI OUTLET, INSTALL NEW VANITY LIGHT FIXTURE
REMOVE/REPLACE (3) OLD WALL PACK LIGHTS WITH NEW LIGHTS (NEXT TO DRIVE WAY). WORK PERFORMED FOR PARK PLACE TOWER CONDO ASSN.
ADDITION OF (1) NEW SERVICE WITHIN THE PARK PLACE TOWER, UTILIZING THE EXISTING 400A DISTRIBUTED UTILITY SOURCE. THIS SCOPE INCLUDES THE ADDITION OF (1) NEW UTILITY METER, (1) 75 KVA TRANSFORMER, AND (1) 200A PANEL.
SPR 2019 CBC PARKING DECK REHABILITATION AND TRAFFIC COATING WITH EXPANSION JOINT REPLACEMENT. JOINT REPLACEMENT INCLUDES REBUILDING SELECT MASONRY WALLS AND STAIR TOWER PENTHOUSE TO ACCOMMODATE MOVEMENT. AS PER PLANS(CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS)
REMOVE/REPLACE OLD BOLLARD LIGHTS WITH NEW - WORK IN FRONT OF BUILDING. FURNISH/INSTALL CONDUIT/WIRE FOR RECEPTACLE OUTLET FEEDS.
ALL ELEVATIONS, REPAIR/REPLACE SEALANT 2000 LINEAR FT., REPAIR/REPLACE CONCRETE SPALLS 825 SQ. FT., REPAIR/REPLACE SEAL CONCRETE CRACKS 1000 LINEAR FT., ONLY
ERECT 2 SCAFFOLDS DATES 7/8/2021 THROUGH 7/8/2022
ERECT ONE(1)SCAFFOLD FROM 09/22/2020 TO 09/22/2021
SEALANT REPLACEMENT 2000LF,CONCRETE PATCHING,825SF ROUT/SEAL CRACKS.
ERECT TWO SCAFFOLDS FROM 09/24/2019 TO 09/24/2020.
UPGRADE EXISTING OUTLETS