SPR 2019 CBRC - WORK IS FOR INTERIOR RENOVATION TO ADD TWO (2) ACCESSORY DWELLING UNITS (ADUS) IN AN EXISTING (6) SIX UNIT, THREE STORY BUILDING. NO EXTERIOR SCOPE. CURRENT USE R-2/RESIDENTIAL, PROPOSED USE R-2/RESIDENTIAL (NO CHANGE)**CERTIFIED CORRECTIONS SUBJECT TO FIELD INSPECTIONS & AUDIT **
WORK IS FOR INTERIOR RENOVATION TO THREE (3) APARTMENT UNITS (SOUTH UNITS) IN A (6) SIX UNIT, THREE STORY BUILDING. NO EXTERIOR SCOPE. CURRENT USE R-2/RESIDENTIAL, PROPOSED USE R-2/RESIDENTIAL (NO CHANGE)
WORK IS FOR INTERIOR RENOVATION TO THREE (3) APARTMENT UNITS (NORTH UNITS) IN A (6) SIX UNIT, THREE STORY BUILDING. NO EXTERIOR SCOPE. CURRENT USE R-2/RESIDENTIAL, PROPOSED USE R-2/RESIDENTIAL (NO CHANGE)
REPLACE EXISTING WOOD DECK AND EXIT STAIR ON EXISTING 3 STORY APARTMENT BUILDING.PROVIDE ELECTRICAL LIGHT FIXTURES ON EXISTING CIRCUITS OVER NEW EXIT STAIR.