600 W Kinzie St, Chicago, IL, 60654 · Chicago · 106 total events
No details available
No details available
No details available
DECOMMISSION OF TWO(2) 20000LB CAPACITY, 5-FLOOR, HYDRAULIC, FREIGHT ELEVATORS, PURSUANT TO THE SCOPE OF WORK SUBMITTED.(EV003290)
No details available
DECOMMISSION OF ONE(1) 5000LB CAPACITY, 5-FLOOR, FREIGHT ELEVATOR(WEST) AND ONE(1) 10000LB CAPACITY, 5-FLOOR, FREIGHT ELEVATOR(EAST), PURSUANT TO THE SCOPE OF WORK SUBMITTED.(EV003290)
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 4/4/2025. END DATE: 5/4/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 3/4/2025. END DATE: 4/3/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 2/3/2025. END DATE: 3/5/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 1/10/2025. END DATE: 2/9/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
No details available
No details available
No details available
ELECTRICAL MAINTENANCE AS NEEDED.
ELECTRICAL MAINTENANCE AS NEEDED.
No details available
SCHEDULED PMS ON ELECTRICAL EQUIPMENT IN A CHOCOLATE FACTORY.
SCHEDULED PMS ON THE ELECTRICAL EQUIPMENT IN A CHOCOLATE FACTORY.
ELECTRICAL MAINTENANCE AS NEEDED.
SCHEDULED PMS ON ELECTRICAL EQUIPMENT IN THE CHOCOLATE FACTORY.
ELEVATOR #4- COMPLY CITY OF CHICAGO FIRE SERVICE MANDATE UPGRADE, INSTALLATION OF RETRACTABLE PIT LADDER, TOE GUARD, PIT STOP SWITCH, CAR TOP HANDRAIL, CAR TOP LIGHTING, HOIST CABLES, AND GOVERNOR CABLE, PURSUANT TO THE SCOPE OF WORK SUBMITTED.(EV003290)
ELEVATOR #3- COMPLY CITY OF CHICAGO FIRE SERVICE MANDATE UPGRADE, INSTALLATION OF RETRACTABLE PIT LADDER, TOE GUARD, PIT STOP SWITCH, CAR TOP HANRAIL, CAR TOP LIGHTING, BRAKE ASSEMBLY, HOIST CABLES, AND GOVERNOR CABLE, PURSUANT TO THE SCOPE OF WORK SUBMITTED.(EV00329)
SCHEDULED PMS ON ELECTRICAL EQUIPMENT IN THE CHOCOLATE FACTORY. - UPDATE SCADA SYSTEMS WITH ADDITIONAL FIELD DEVICES. - REPLACEMENT OF THE TEMPERING UNIT FOR THE MOLDING LINE 1.
SCHEDULED PMS ON THE ELECTRICAL EQUIPMENT IN THE CHOCOLATE FACTORY. - REWIRE CONTROLS FOR OIL STORAGE TANKS 101-109.
No details available
SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE FACTORY. - UPDATE CONTROLS FOR 3RD FLOOR STORAGE TANKS. - UPDATE CONTROLS FOR PASTE DEP. BATCHES CONTROLS.
SCHEDULED PMS ON ELECTRICAL EQUIPMENT IN THE CHOCOLATE FACTORY. - UPDATE CONTROLS SYSTEM FOR PUMPING AND STORAGE TANKS.
SCHEDULED PMS ON ELECTRICAL EQUIPMENT IN THE CHOCOLATE FACTORY. - INSTALL A REPLACEMENT CONTROL PANEL FOR BUTTER ADDITIONS TANKS FOR THE PASTE DEP.- WIRE NEW LEVEL SENSORS FOR STORAGE TANKS 2ND FLOOR.
SCHEDULED PMS OF ELECTRICAL EQUIPMENT IN THE CHOCOLATE FACTORY. - UPDATE SCADA CONTROLS FOR TANKS TNK300-TNK390.
SCHEDULED PMS ON ELECTRICAL EQUIPMENT IN THE CHOCOLATE FACTORY PLANT; - UPDATE PLANT OT COMMUNICATION SYSTEM FOR MANUFACTURING PROCESSES.
No details available
SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE THE CHOCOLATE FACTORY. - THERMAL SCAN OF MAIN DISTRIBUTIONS ON 4 SERVICES. - REWIRE CONTROLS FOR MOLDING RM. FEED LINES. - REWIRE OIL ADDITIONS STATION FOR BATCHES.
SCHEDULED PMS ON ELECTRICAL EQUIPMENT IN THE CHOCOLATE FACTORY. - UPDATE CONTROLS FOR STORAGE TANKS TNK125-TNK125. - REWIRE CONTROLS FOR LEVEL SENSORS ON OIL TANKS TNK101-TNK109.
No details available
SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE FACTORY.
SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE FACTORY PLANT; - WIRE NEW LEVEL SENSORS FOR NI SILOS 1-4; - UPDATE CONTROLS FOR STORAGE TANKS 120-123; - REWIRE HEAT TRACE CIRCUITS IN THE TANK FARM, 1ST FLOOR.
SCHEDULED PMS ON ELECTRICAL EQUIPMENT IN A CHOCOLATE FACTORY. - WIRE LEVEL SENSORS FOR MOLDING FEED LINES. - UPDATE STORAGE TANKS TNK111-TNK118 TO THE NEW CONTROL SYSTEM. - WIRE LIMIT SWITCHES ON REFINING BELTS. - UPDATE PLANT OT COMMUNICATION SYSTEM.
SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE PLANT. - REWIRE FIRE SUPPRESSION SYSTEM VALVES AND ACTUATORS FOR ROASTERS. - WIRE STEEL BELT INTERLOCKS ON REFINING. - REWIRE CONTROLS ON PRESS 8.
No details available
SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE FACTORY. - REPLACE OLD TEMPERING TUBES WIRING FOR MOLDING LINES 2 AND 3.
SCHEDULED PMS ON ELECTRICAL EQUIPMENT IN THE CHOCOLATE FACTORY. - WIRE REPLACEMENT MOLD TEMPER UNITS FOR LINES 2 AND 3. - INSTALL AND WIRE NEW HEAT TRACE CIRCUITS FOR MOLDING LINES 2 AND 3.
BLOMMER CHOCOLATE COMPANY - 131-45981-03 - LOW VOLTAGE PERMIT FOR LOW VOLTAGE NON-REQUIRED FIRE ALARM INSTALLATION
SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE FACTORY. - REPAIRS ON WIRING FOR ROASTER A POWER AND CONTROLS. - WIRE ADDITIONAL HEAT TRACE CIRCUITS FOR THE LS AREA.
SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE MANUFACTURING PLANT. WIRE REPLACEMENT TEMPER UNITS FOR MOLDING L2 AND L3. WIRE HEAT TRACE PANEL FOR TANK FARM HEATING CKTS.
SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE FACTORY. - REPLACE LIGHT FIXTURES IN THE FRONT LOBBY. - RELOCATE VISUAL MONITORS FOR THE SECURITY OFFICE.
SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE MANUFACTURING FACILITY; - REWIRE CIRCUITS FOR LIGHTS AND RECEPTACLES IN THE ROASTING DEPARTMENT. REPAIRS AND REPLACEMENT OF POWER AND CONTROL WIRING ON ROASTERS A & B.
SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE FACTORY. - WIRE NEW HEAT TRACE CIRCUIT CONTROLLER AND HEAT TRACE CIRCUITS IN THE LS AREA. - ROASTING POWER AND CONTROLS TESTS AND REPAIRS - CONTINUED WORK FROM THE PREVIOUS MONTH.
No details available
SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE FACTORY; - WIRE REPLACEMENT HVAC UNIT 3A FOR WAREHOUSE; MOLDING LINE 3 SPILL PREVENTION UPDATE.
SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE MANUFACTURING PLANT; - WIRE REPLACEMENT METAL DETECTORS FOR PRODUCTION LINES.