SPR 2019 CBRC: MECHANICAL WORK ONLY: INSTALLATION OF (2) NEW MECHANICAL FURNACE AND (2) CONDENSING UNITS, INCLUDING NEW DUCTWORK, TO EXISTING 3 STORY WITH BASEMENT SINGLE FAMILY RESIDENTIAL BUILDING. NO EXTERIOR WORK TO BE DONE ON BUILDING EXCEPT INSTALLATION OF AC UNITS. INCIDENTAL ELECTRICAL AND PLUMBING WORK FOR INSTALLATION OF FURNACES. (OCCUPANCY: R5; CONSTRUCTION TYPE: V-A, ZONING: RS-3)
SPR 2019 CBRC: MECHANICAL WORK ONLY: INSTALLATION OF (2) NEW MECHANICAL FURNACE AND (2) CONDENSING UNITS, INCLUDING NEW DUCTWORK, TO EXISTING 3 STORY WITH BASEMENT SINGLE FAMILY RESIDENTIAL BUILDING. NO EXTERIOR WORK TO BE DONE ON BUILDING EXCEPT INSTALLATION OF AC UNITS. INCIDENTAL ELECTRICAL AND PLUMBING WORK FOR INSTALLATION OF FURNACES. (OCCUPANCY: R5; CONSTRUCTION TYPE: V-A, ZONING: RS-3)
LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 10 . LIGHTING OUTLETS: 10. SPECIFIC LOCATION: BASEMENT, SIDE WALL.