REPLACE CONCRETE TOPPING SLAB AND MEMBRANE, TUCKPOINT AND INSTALL FLASHING, REPLACE BASEMENT DRYWALL, REPLACE DRAINPIPE. LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), EXTERIOR WORK, COURTYARD PLANTER.
SC 2019 CBRC: INTERIOR ALTERATIONS OF UNIT 1D2D IN EXISTING 5 STORY 3-A CONSTRUCTION CONDO BUILDING. OCCUPANCY GROUP R-2
REPLACE (2) FURNACES.
REMOVE AND REPLACE EXISTING CARRIER 10 TON CONDENSING UNIT WITH NEW CARRIER 10 TON CONDENSING UNIT, REMOTE, AIR COOLED, R410A, LOCATED ON THE GARAGE ROOF, SERVING UNIT 1A.
TUCKPOINTING(500SQ FT),PATCH CONCRETE(200 SQ FT),REPLACE SEALANT.
COMED HAS TO RELOCATE A 3000 AMP TAPBOX LOCATED UNDER THE EXISTING COLLAPSING VAULTED SIDEWALK IN FRONT OF THIS BUILDING FEEDING THE ELECTRIC SERVICES TO THIS BUILDING. WE WILL NEED TO INSTALL A NEW 3000 AMP TAPBOX WITH A NEW 3000 AMP SWITCHGEAR,NEW FEEDER TO FIRE PUMP,AND NEW FEEDER TO EM SERVICE.