CBC 2019: NEW PRIVATE ROOFTOP DECK WITH NEW DOGHOUSE AND STAIRS FROM WITHIN UNIT (TO EXISTING 5 STORY RESIDENTIAL MASONRY BUILDING)
HOT WATER HEATER (REPLACEMENT ONLY): QTY 1
MODERNIZATION OF TWO (2) 2500LB.CAP, 125 FPM, HYDRAULIC PASSENGER ELEVATORS #E (1) 6-STOP, #W 5-STOP. PURSUANT TO THE SCOPE OF WORK SUBMITTED. EV009014
INSTALLATION OF NEW JACK ASSEMBLY ON ONE(1) 2500LB CAPACITY, 6-FLOOR, 150FPM, PASSENGER ELEVATOR(#1 WEST), PURSUANT TO THE SCOPE OF WORK SUBMITTED.(EV009014)
HOT WATER HEATER (REPLACEMENT ONLY): QTY 1
SPR 2019 CBRC: EXTERIOR ALTERATIONS TO EXISTING 5 STORY CONDO BUILDING WITH GROUND FLOOR RETAIL. INCLUDES PARAPET WALL AND PORTIONS OF THE EXTERIOR WALL AT THE SOUTHEAST CORNER OF BUILDING AT THE EAST AND SOUTH ELEVATIONS AS PER PLANS. (EXIST OCC R-2, IIIA CONST) *CERTIFIED PLAN CORRECTIONS - CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTION*
REMOVE EXISTING ROOF AND REPLACE WITH NEW; STRIPPING MODIFIED BITUM BARRIER, LEAVING THE INSULATION AND ROOFING OVER WITH NEW TPO
No details available
No details available
No details available