SPR 2019 CBRC: PARTIAL INTERIOR RENOVATION OF AN EXISTING 6 FLAT BUILDING INCLUDING THE ADDITION OF AN ADU ON THE LOWER LEVEL. FOR A TOTAL OF 7 DWELLING UNITS. OCCUPANCY R2, CONSTRUCTION TYPE IIIB(CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS)
SPR 2019 CBRC: PARTIAL INTERIOR RENOVATION OF AN EXISTING 6 FLAT BUILDING INCLUDING THE ADDITION OF AN ADU ON THE LOWER LEVEL. FOR A TOTAL OF 7 DWELLING UNITS. OCCUPANCY R2, CONSTRUCTION TYPE IIIB(CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS)
ON SOUTH ELEVATION REPLACE 12 LINTELS SAME AS EXISTING ALL UNDER 6'LONG. SPOT TUCKPOINTING 400SQFT. ON NORTH AND EAST ELEVATIONS.