ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 10/18/2025. END DATE: 10/18/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 10/18/2024. END DATE: 10/18/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
JULY, AUGUST, & SEPTEMBER MAINTENANCE
PERMIT EXPIRES ON 07/06/2024 ERECTION STARTS: 5/16/2024, ERECTION ENDS: 5/17/2024. THIS IS NOT A STAGE REINSTATEMENT.SELF-CERT 2019 CBRC: ERECTION STARTS: 5/16/2024, ERECTION ENDS: 5/16/2024 - ERECT ONE (1) TEMPORARY MOBILE STAGE SYSTEM USING "MODEL # SL100 STAGE" AT A SIZE OF 24' WIDE X 20' DEEP = 480 SQ.FT. THIS STAGE WILL BE DISMANTLED ON 05/17/24 - NOTE: THE EVENT WILL START ON 05/16/2024 AND WILL END ON 05/17/2024 - (CONSTRUCTION TYPE IS "V-B" AND THE OCCUPANCY GROUP IS "U").
APRIL, MAY AND JUNE MAINTENANCE
DECEMBER PERMIT FILING
OCTOBER, NOVEMBER AND DECEMBER MAINTENANCE
OCTOBER, NOVEMBER AND DECEMBER MAINTENANCE
FACADE REPAIRS:LOCATE EXISTING SPALLS IN THE CONCRETE CURB AND REMOVE THE SPALL. INSTALL A NEW SECTION OF CONCRETE CURB 20SQFT. RESEAL 100% OF WINDOW FRAMES/FACADE JOINTS 540LF.
JULY, AUGUST, AND SEPTEMBER MAINTENANCE
APRIL, MAY AND JUNE MAINTENANCE
JANUARY, FEBRUARY AND MARCH MAINTENANCE
OCTOBER, NOVEMBER AND DECEMBER MAINTENANCE
JUNE PERMIT FILING - JULY, AUGUST AND SEPTEMBER MAINTENANCE
APRIL, MAY AND JUNE MAINTENANCE
JANUARY, FEBRUARY, AND MARCH MAINTENANCE
OCTOBER, NOVEMBER AND DECEMBER MAINTENANCE
No details available
850 SQ FT TUCKPOINTING AND CAST STONE PATCH REPAIRS
JULY, AUGUST AND SEPTEMBER MAINTENANCE
**FIRE ALARM PERMIT**MODIFY AN EXISTING NOTIFIER NFS-320 ADDRESSABLE FIRE ALARM SYSTEM IN AN EXISTING 1 STORY BUILDING FOR A TENANT BUILDOUT. DRAWINGS SUBMITTED FOR NON-JURISDICTIONAL STAMP PER CBC 15-16-110
APRIL, MAY, AND JUNE MAINTENANCE.
INTERIOR BUIL-DOUT OF FIRST FLOOR OF DEPAUL UNIVERSITY BUILDING TO INCLUDE NEW FLOOR LAYOUT AND MEP AS PER PLANS (CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS.)
INTERIOR REMOVAL OF NON LOAD BEARING WALLS INCLUDING ELECTRICAL AND MECHANICAL FIXTURES AS PER PLANS LOCATED ON THE FIRST FLOOR FOR DEPAUL UNIVERSITY BUILDING. NO STRUCTURAL WORK, OR CHANGES TO EXITS.
JANUARY, FEBRUARY, AND MARCH MAINTENANCE
OCTOBER, NOVEMBER AND DECEMBER MAINTENANCE
INSTALLATION OF A MONITORED ALARM SYSTEM
JULY, AUGUST AND SEPTEMBER MAINTENANCE
DATA CABLING SUITE 100
INSTALL 1 SET OF LED CHANNEL LETTERS TO READ NOVA CARE REHABILITATIONON THE EAST ELEVATION
INSTALL 1 SET OF LED CHANNEL LETTERS TO READ NOVA CARE KIDS ON THE EAST ELEVATION
APRIL, MAY AND JUNE MAINTENANCE.
TENANT BUILD-OUT FOR SELECT MEDICAL (TENANT) SPACE AT 2400 NORTH SHEFFIELD AVE. THE PRIOR OCCUPANCY OF THE SPACE WAS CLASS E AND THE PROPOSED OCCUPANCY IS THE SAME, CLASS E (MEDICAL SERVICE). SCOPE OF WORK INCLUDES DEMOLITION AND CONSTRUCTION OF NEW PARTITIONS. NEW MECHANICAL AND PLUMBING FOR THE SPACE. TYPICAL ELECTRICAL WORK WILL BE NEW FIXTURES AND LOW VOLTAGE. FINALLY, NEW EQUIPMENT AND FURNITURE FOR THE SPACE.
JANUARY, FEBRUARY, AND MARCH MAINTENANCE
OCTOBER, NOVEMBER AND DECEMBER MAINTENANCE.
No details available
JULY, AUGUST AND SEPTEMBER MAINTENANCE
SEALANT, BRICK, TUCKPOINTING , & FLASHING REPAIRS.
JULY, AUGUST, AND SEPTEMBER MAINTENANCE.