ERECT TWO (2) SCAFFOLDS DATES 07/28/2022 THROUGH 07/28/202
INSTALLATION STRUCTURED & SECURITY CABLING FOR FLAIR TOWER
LOW VOLTAGE TEMPERATURE CONTROL WIRING C223566
SPR 2019 CBRC, PD 326: RENOVATION OF EXISTING RESIDENTIAL TOWER. INTERIOR RENOVATIONS TO EXISTING GROUND FLOOR LOBBY AND LEASING CENTER AND 6TH FLOOR AMENITY SPACE (INCLUDING CLUB ROOM, FITNESS CENTER.) REMOVAL OF ONE DWELLING UNIT TO BE CONVERTED INTO AMENITY SPACE. RENOVATION TO OUTDOOR ROOF DECK AND SELECT EXTERIOR FINISHES. (OCCUPANCY GROUP A-2, A-3, R-2, S-2; TYPE IA CONSTRUCTION) **CERTIFIED PLANS CORRECTIONS: CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS **
ERECT TWO(2)SCAFFOLD FROM 09/18/2020 TO 09/18/2021.
TUCKPOINT ALL ELEVATIONS, REPAIR/REPLACE SEAL CRACKS 300 LINEAR FT., REPAIR/REPLACE CONCRETE SPALLS 30 SQ. FT., REPAIR/REPLACE WINDOW PERIMETER SEALANT 200 LINEAR FT., TUCK-POINT 100 LINEAR FT., REPAIR/REPLACE CONCRETE WATER PROOFING MODAC 200 SQ. FT.,
ERECT THREE SCAFFOLDS FROM 09/03/2019 TO 09/03/2020.
WATER DAMAGE REPAIR FOR (3) 26 STOP, 3500LB CAPACITY(2), 4000LB CAPACITY(1), GEARED PASSENGER ELEVATORS PURSUANT TO THE SCOPE OF WORK SUBMITTED.(100302078)