REHABILITATE BASEMENT DWELLING UNIT WITHIN EXISTING MASONRY BUILDING, INCL MEP, AS PER PLANS.
TUCKPOINTING - NO STRUCTURAL WORK - 5 SQFT
REPLACE EXISTING REAR OPEN WOOD PORCH SAME SIZE AND LOCATION
REPAIR EXISTING REAR OPEN WOOD PORCH SAME SIZE AND LOCATION
CHANGE TWO GANG METER SERVICE INTO 3 GANG METER AS TO PROVIDE SEPARATE SERVICE TO BLDG PROVIDE COLD WATER GROUND AND GROUNDING ELECTRODE ADD METER CABINET FOR BADGE
CHANGE TWO GANG METER SERVICE INTO 3 GANG METER AS TO PROVIDE SEPARATE SERVICE TO BLDG PROVIDE COLD WATER GROUND AND GROUNDING ELECTRODE ADD METER CABINET FOR BADGE
REPLACE PLASTER WITH DRYWALL IN 1ST FLOOR UNIT. REMOVE CARPET. CABINETS. REFINISH HARDWOOD FLOORS. REPLACE WINDOWS & DOORS. TILE- ALL WORK SAME AS EXISTING
WRECK AND REMOVE A DETACHED MASONRY RESIDENTIAL GARAGE