REPAIR/REPLACEMENT AFFECTING 1 SYSTEMS : 1 SINGLE PACKAGE VERTICAL UNIT(SIGMA SDSV-C-3-180-2-F-1DSVAGA1SAP000000) . ELECTRICAL WORK UNDER THIS PERMIT = NO . LOCATIONS: 1 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), 2ND FLOOR.
TEMPORARY SCAFFOLDING: QTY: 1, MAX. LENGTH: 60 FT., MAX. HEIGHT: 340 FT. LOCATION: NORTH EAST AND WEST ELEVATION. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE
SPR 2019 CBC INTERIOR RENOVATIONS AND ALTERATIONS OF UNIT 1601 IN MULTI STORY, MULTI UNIT BUILDING.
TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 100 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. CONCRETE MASONRY REPAIR / REPLACEMNT: 25SQ. FT., EXCAVATION = NO. LOCATION: ALL FACADE ELEVATIONS.
TEMPORARY SCAFFOLDING: QTY: 1, MAX. LENGTH: 160 FT., MAX. HEIGHT: 280 FT. LOCATION: ALL FACADE ELEVATIONS. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE
SPR 2019 CBRC:INTERIOR WALL & CEILING REPAIRS AT 34TH FLOOR, REPLACEMENT OF EXISTING DOMESTIC WATER RISERS, REPLACEMENT ONLY ON FLOORS 1-35, UNDERGROUND RELINING OF DRAINAGE, NEW DRAINAGE PIPING ON LOWER FLOORS PER PLANS (OCCUPANCY R-2, TYPE IIB CONSTRUCTION, 417 RESIDENTIAL UNITS AND 5 RETAIL UNITS)
ERECT ONE (1) SCAFFOLD DATES 08/31/2023 THROUGH 08/31/2024
RESIDENTIAL DECK/A2 NO CHANGE. PRIVATE WOOD DECKS FOR INDIVIDUAL UNIT OWNERS WERE INITIALLY INSTALLED WHEN THE BUILDING WAS BUILT, PER THE ORIGINAL BUILDING DRAWINGS. THE WOOD DECKS WERE RECENTLY REMOVED WHEN THE ROOF WAS REPLACED AND CONCRETE PAVERS REMOVED AND RESET. THIS PROJECT IS TO INSTALL ALUMINUM VERSADECK ON TOP OF (AND ANCHORED TO) THE CONCRETE PAVERS AT LOCATIONS WHERE THE ORIGINAL WOOD DECKS WERE LOCATED AT 31' ABOVE GRADE AND REATTACH EXISTING GUARDRAILS.
INSTALL NEW LIGHTS, SWITCHES, OUTLETS AND DISHWASHER. UNIT 1511
ERECT ONE (1) SCAFFOLD DATES 06/22/2022 THROUGH 06/22/2023
REPLACE TWO CONDENSING UNITS WITH ONE 10 TON, AND ONE 5 TON, AIR COOLED, REMOTE, R410A, AAON CONDENSING UNITS, LOCATED AT GRADE, AND SERVING COMMERCIAL SPACE. STAMPED PLANS PROVIDED.
REMOVE EXISTING ROOFING MATERIAL AND REPLACE WITH SAME KIND.NO STRUCTURAL WORK.
TUCKPOINTING AT 3RD FLOOR, WEST ELEVATION 3RD FLOOR POOL WALLS, REPLACE JOINT SEALS.
REMOVE AND REPLACE EXISTING ROOFING MATERIAL WITH SAME IN KIND, NO STRUCTURAL
REMOVE EXISTING DE-BONDED MEMBRANE, INSTALL NEW BASF MEMBRANE SYSTEM AT PARKING LOT; W/ CONCRETE REPAIRS
INSTALL NEW STEEL BEAMS & POSTS REMOVE AND REPLACE CONCRETE SLAB ON EXISTING GARAGE DOOR AS PER PLANS
UPDATE EXISTING OUTLETS, INSTALL MICROWAVE OUTLET, UPDATE EXISTING PANEL