INSTALL RECEPTACLE FOR THE DATA MODEM IN EACH UNIT
SPR 2019: INSTALLATION OF 153 "THROUGH THE WALL" PACKAGED TERMINAL HEAT PUMP (PTPH) UNITS AS A LIKE KIND REPLACEMENT OF APARTMENT WINDOW AC UNITS. PTHP UNITS INCLUDE AN ELECTRIC RESISTANCE HEATING ELEMENT AND WILL PROVIDE HEATING AND COOLING FOR THE 69 APARTMENTS. RELATED WORK INCLUDES THE DECOMMISSIONING OF COMMON BOILER HEAT IN BASEMENT OF BUILDING. EXISTING FIN TUBE RADIATORS WILL REMAIN IN PLACE IN EACH APARTMENT UNIT BUT FIN TUBE WILL BE NON-FUNCTIONAL.(NO ELECTRICAL WORK UNDER THIS PERMIT.
**ELECTRICAL ONLY PERMIT**ELECTRICAL ONLY TO SUPPORT COM-ED SERVICE ONLY.
INSTALLING A NEW ELECTRICAL LINE 30 AMP 240 VOLT SINGLE PHASE FOR A MINI SPLIT SYSTEM UNIT FOR THE OUTDOOR UNIT AND 20 AMP SINGLE PHASE 120 VOLT FOR THE INDOOR BLOWER FOR THE LOBBY
REPLACE (1) MAKE UP AIR UNIT.
REPLACEMENT OF (6) MAU'S WITH (6) AAON 6 TON MAU'S, SELF CONTAIED, AIR COOLED, R410A, LOCATED ON THE ROOF.
REPLACE LOUVER AND INSTALL UNIT HEATER IN BOILER ROOM.
REPLACE EXISTING 120 V, 15 A RECEPTACLE OUTLETS AND WIRES WITH NEW ONES 240 V, 20 A.
REMOVE HEAT WINDOW UNIT CIRCUITS FROM EXISTING 20 AMPS DOUBLE POLE CIRCUIT BREAKER FROM ALL APARTMENTS.
RETROFITTING EXISTING FLOURCENT LIGHTING WITH UL LISTED LED LIGHTING