INSTALL RECEPTACLE FOR THE DATA MODEM IN EACH UNIT
SPR 2019: INSTALLATION OF 153 "THROUGH THE WALL" PACKAGED TERMINAL HEAT PUMP (PTPH) UNITS AS A LIKE KIND REPLACEMENT OF APARTMENT WINDOW AC UNITS. PTHP UNITS INCLUDE AN ELECTRIC RESISTANCE HEATING ELEMENT AND WILL PROVIDE HEATING AND COOLING FOR THE 69 APARTMENTS. RELATED WORK INCLUDES THE DECOMMISSIONING OF COMMON BOILER HEAT IN BASEMENT OF BUILDING. EXISTING FIN TUBE RADIATORS WILL REMAIN IN PLACE IN EACH APARTMENT UNIT BUT FIN TUBE WILL BE NON-FUNCTIONAL.(NO ELECTRICAL WORK UNDER THIS PERMIT0
**ELECTRICAL ONLY PERMIT**ELECTRICAL ONLY TO SUPPORT COM-ED SERVICE ONLY.
REPLACE (1) MAKE UP AIR UNIT.
REPLACE LOUVER AND ISTALL UNIT HEATER IN BOILER ROOM.
REPLACE EXISTING 120 V, 15 A RECEPTACLE OUTLETS AND WIRES WITH NEW ONES 240 V, 20 A.
REMOVE HEAT WINDOW UNIT CIRCUITS FROM EXISTING 20 AMPS DOUBLE POLE CIRCUIT BREAKER FROM ALL APARTMENTS.
No details available
RETROFITTING EXISTING FLOURCENT LIGHTING WITH UL LISTED LED LIGHTING