PERFORM CITY OF CHICAGO 2017 PHASE II MANDATE UPGRADE ON THREE(3) 2500LB CAPACITY, 23-FLOOR, 350FPM, PASSENGER ELEVATORS, PURSUANT TO THE SCOPE OF WORK SUBMITTED.(77629)
SCOPE: NONSTRUCTURAL INTERIOR ALTERATION TO MASTER BATHROOM, LIVING ROOM, AND HALLWAY TO FINISH FLOORS AND OR REPLACE (NOT TO EXCEED 90 SF), MAKE DRYWALL REPAIRS (NOT TO EXCEED 45 SF), INSTALL NEW TILE IN MASTER BATHROOM, ADD NEW PLUMBLING FIXTURES. LOCATIONS: 1 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), 10B
TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 900 SQ. FT., LINTEL QTY. 80, MAX. LENGTH 12. CONCRETE MASONRY REPAIR / REPLACEMNT: 50SQ. FT., EXCAVATION = NO. LOCATION: WEST ELEVATION & NORTH AND SOUTH WALLS.
BATHROOM RENOVATION:NEW FLOORING,NEW DOORS,ADD GRAB BARS,NEW FINISHES.(NO NEW PLUMBING & NEW ELECTRICAL WORK).
REPLACE (1) REZNOR MAKE UP AIR UNIT.
REMOVE (1) 185 TON CHILLER AND REPLACE WITH (2) 90 TON TRANE CHILLERS, SELF CONTAINED, AIR COOLED, R410A. REMOVE (1) MAKE-UP AIR UNIT AND INSTALL (1) REZNOR PCDH 150 MAKE-UP AIR UNIT, REMOTE CONDENSER EXISTING.