LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 1. SPECIFIC LOCATION: BASEMENT.
No details available
SPR 2019 CBRC: ALTERATIONS TO EXISTING UNPERMITTED BASEMENT DWELLING UNIT IN 2-STORY RESIDENCE WITH EXISTING PERMITTED DWELLING UNITS. ALTERATIONS TO EXISTING BASEMENT DWELLING UNIT TO BRING BASEMENT UNIT INTO FULL ADU COMPLIANCE, INCLUDING MEP UPDATES INCLUDING NEW EQUIPMENT/LAYOUT. INT. WORK FOR NEW WATER SERVICE TO UNIT. REPURPOSING EXISTING UNUSED ELEC PANEL FOR ADU. (OCCUPANCY R-5; CONSTRUCTION TYPE III-A)
SPR 2019 CBRC: PERMIT TO RESOLVE BUILDING VIOLATIONS. SCOPE OF WORK INCLUDES TUCKPOINTING ON THE EAST WALL AT THE BASEMENT AND 2ND LEVEL, REPAIR OF CORNICE, A NEW REAR STEEL STAIR AND PORCH AND NEW ROOF DECK WITH PERGOLA AND STAIR AS PER PLANS (OCCUPANCY R-5, CONSTRUCTION TYPE III-A) - APPROVED ACAR ON FILE**CERTIFIED CORRECTIONS SUBJECT TO FIELD INSPECTIONS & AUDIT **
No details available