REPLACEMENT OF 3-STORY OPEN REAR WOOD PORCH. NO CHANGE IN SIZE/LOCATION/CONFIGURATION.(OCCUPANCY GROUP R-2; TYPE IIIA CONSTRUCTION)
No details available
PROVIDE DEADLOCK FOR ENTRANCE
ARRANGE PREMISE INSPECTION
REPAIR EXTERIOR DOOR HARDWARE
REPAIR EXTERIOR DOOR
CARB MONOX DETECT IN RESID
REMOVE STAGNANT WATER BSMT
FILE BLDG REGISTRATION
ARRANGE FOR REINSPECTION REGAR
REPAIR PORCH SYSTEM