No details available
No details available
No details available
SPR 2019 CBRC DECONVERT FROM 3 TO 2 EXISTING RESIDENTIAL UNITS, REMOVE ROOMS IN ATTIC AND CONVERT INTO ORIGINAL STORAGE SPACE, ENCLOSE MECHANICAL ROOM & FRONT WOOD STAIR AND LANDING TO BE REPLACED SAME SIZE AND SAME LOCATION TO CORRECT BUILDING VIOLATIONS AS PER ARCHITECT'S PLANSIN AN EXISTING 2-1/2 STORY WITH BASEMENT AND ATTIC FRAME BUILDING.THE SCOPE OF WORK INCLUDES: ARCHITECTURE, PLUMBING AND ELECTRIC. CURRENT USE: 3 DU'S PROPOSED USE: 2 DU'S **CERTIFIED CORRECTIONS SUBJECT TO FIELD IN
DEMO WIRING AND CONDUIT FOR ATTIC BATHROOM
PLANS & PERMITS REQ - CONTRCTR
No details available
No details available
No details available
No details available