TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 100 SQ. FT., LINTEL QTY. 2, MAX. LENGTH 4. LOCATION: FRONT FACADE.
TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 100 SQ. FT., LINTEL QTY. 2, MAX. LENGTH 4. LOCATION: FRONT FACADE.
REPAIR SCREENS
REPAIR LINTELS
REPAIR WINDOW SILLS
PARAPET & COPING
REPAIR EXTERIOR WALL
ARRANGE FOR REINSPECTION REGAR
REPAIR PORCH SYSTEM
ARRANGE PREMISE INSPECTION
CONNECT DOWNSPOUT TO SEWER
NOTIFY DOB, USE OF VACANT LND
EXPOSED WIRING
REPAIR EXTERIOR WALL