SPR 2019 CBRC - INTERIOR RENOVATION, DECONVERSION OF 2 DWELLING UNITS TO A SFR, AND NEW STEEL BALCONY. REAR ADDITION, AND LOWERING BASEMENT FLOOR WITH UNDERPINING IN AN EXISTING 2 STORY PLUS BASEMENT FRAME RESIDENCE. EXISTING R-5 OCCUPANCY, NO CHANGE IN OCCUPANCY.AS PER PLANS**CERTIFIED CORRECTIONS SUBJECT TO FIELD INSPECTIONS & AUDIT **
SPR 2019 CBRC - INTERIOR RENOVATION, DECONVERSION OF 2 DWELLING UNITS TO A SFR, AND NEW STEEL BALCONY. REAR ADDITION, AND LOWERING BASEMENT FLOOR WITH UNDERPINING IN AN EXISTING 2 STORY PLUS BASEMENT FRAME RESIDENCE. EXISTING R-5 OCCUPANCY, NO CHANGE IN OCCUPANCY.AS PER PLANS**CERTIFIED CORRECTIONS SUBJECT TO FIELD INSPECTIONS & AUDIT **
No details available
REPAIR DOWNSPOUT
POST OWNER/MANAGERS NAME/#