SPR 2019 CBC REPAIR FIRE DAMAGED REAR ENCLOSED AREA, NEW METAL DECK AND STAIRS AT REAR, NEW DORMER AT FRONT OF 4TH FLOOR, (CONVERT THE PROPERTY FROM 3 DU TO 4 DU). WORK INCLUDES INTERIOR ALTERATIONS AND MEP SYSTEMS FOR THE EXISTING 4 STORY TYPE IIIA MASONRY BRICK BUILDING. R2 OCCUPANCY CLASSIFICATION.
INSTALL TEMPORARY 100 AMP SERVICE AND PANELTO ASSIST WITH PROPOSED REPAIRS WITHIN THE PREMISE. SERVICE TO BE UPGRADED AT LATER DATE
UPGRADE TO 200 AMP SERVICE, 4 BANK METER SOCKET
REMV OBSTR FROM DRAINAGE SYSTM
REPLACE DEFECTIVE FAUCET
TEST ALTERED SYSTEM