SPR 2019 CBRC DUPLEX BASEMENT TO FIRST & NEW HEATING SYSTEM FOR BASEMENT, FIRST & SECOND FLOORS TO AN EXISTING 2 STORY BRICK BUILDING., AS PER PLANS CLASSIFICATION OF BUILDING BY BUILDING TYPE: III-ACLASSIFICATION OF BUILDING BY OCCUPANCY R-5
DUE TO REMOVAL OF ALL DRYWALL AND PLASTER, DISCONNECT ELECTRICAL DISTRIBUTION TO ALL RECEPTACLES, SWITCHES AND LIGHT FIXTURES.
DWELLING CLEAN AND SANITARY
WINDOW REPAIR FOR AIR SEEPAGE
REPAIR EXTERIOR WALL
REPAIR FENCE
HEAT UNIT ADEQUATELY
REPAIR INTERIOR WALLS/CEILING
INSTALL SMOKE DETECTORS
UNAPPROVED HEATING DEVICE
ROACHES
REPAIR/REPLACE SMOKE DETECTORS
WRECK AND REMOVE EXISTING GARAGE, REPLACE WITH 22' 4"(L) 20(W) 14'6"(H) FRAME GARAGE
OBSTRUCTIONS IN EXIT WAY
PARAPET & COPING
REPAIR EXTERIOR WALL
REPAIR PORCH SYSTEM
CUT OR REMOVE HIGH WEEDS
REPAIR/REBUILD GARAGE OR SHED
REPAIR EXTERIOR WALL
NO KEY TO USE EXIT DOOR
PARAPET & COPING
REPAIR/REBUILD GARAGE OR SHED
ARRANGE PREMISE INSPECTION
REPAIR/REBUILD GARAGE OR SHED