No details available
INTERIOR AND EXTERIOR ALTERATION TO ADD 1 DWELLING UNIT TO BASEMENT TO EXISTING 2 STORY 2 DWELLING UNITS.WILL BE 3 DWELLING UNITS UNITS TOTAL, TYPE 3B CONSTRUCTION.
No details available
No details available
1-HR HEATING PLANT SEPARATION
CARB MONOX DETECT IN RESID
REPAIR/REPLACE SMOKE DETECTORS
PROVIDE
INT WALL/CEILING CHIP PLASTER
REPAIR DOWNSPOUT
REPAIR EXTERIOR WALL
REPLACE DEFECTIVE FLUSH TANK
REPAIR INTERIOR WALLS/CEILING
REPAIR PORCH SYSTEM
INT WALL/CEILING PEELING PAINT
SCREEN OUTER DOORS, WINDOWS
REPAIR OR REPLACE
PROVIDE GUARD RAIL 42 IN HIGH
REPAIR/REPLACE SMOKE DETECTORS
REPAIR INTERIOR WALLS/CEILING
INT WALL/CEILING PEELING PAINT
REPLACE DEFECTIVE FLUSH TANK
REPAIR EXTERIOR WALL
SCREEN OUTER DOORS, WINDOWS
REPAIR DOWNSPOUT
REPAIR OR REPLACE
PROVIDE GUARD RAIL 42 IN HIGH
1-HR HEATING PLANT SEPARATION
CARB MONOX DETECT IN RESID
PROVIDE
REPAIR PORCH SYSTEM
INT WALL/CEILING CHIP PLASTER