2315 S FLOWER ST, Los Angeles, CA 90007 · Los Angeles · 6 total events
Self Service
Verizon proposes to modify its power upgrade: Install (1) Integrated Load Center (ILC), Install (1) 600A power plant upgrade, Install (1) proposed DC upconverter, Install Feed Line extensions to ILC & MCE#1
ePlan. Complete removal of existing 'Sprint' cell site. Removal of an existing telecom facility and equipment followed by restoration to original condition.
Homeless Encampment
Single Streetlight Issue
Homeless Encampment