2700 N VERMONT AVE, Los Angeles, CA 90027 · Los Angeles · 13 total events
(eplan) Demolish existing concrete slab ceiling over basement restrooms. Provide structural support for new concrete infill slab. Re-apply waterproof membrane
Self Service
MODIFY EX. MONOPOLE WIRELESS TELECOMMUNICATION FACILITIES. REMOVE AND REPLACE EQUIPTMENT PER PLANS.
eplan 1. Installation of (1) C-band Antenna to an existing antenna support pipe mast2. Installation of (3) Remote Radio Units inside Lighting Control Room
Temporary use of New patio cover with accessible wood frame access ramp . ( permit Valid for a period of 6 months after permit issuance date)
Modification to existing telecommunication site. The scope will consist of the following:Equipment Level in an (E) building:- Remove (1) (E) DUW30- Remove (1) (E) Alpha Power plant with (6) rectifiers- Relocate (2) (E) 180AH string batteries fron (N) DC power plant- Install (1) (N) Netsure 7100 DC power plant with (10) (N) rectifiers- Install (1) (N) 180AH string battery within (E) battery rack- Install (2) (N) 606 DC trunks 2 of 2
Modify an existing wireless telecommunication site. The scope will consist of the following:Antenna Level:- Remove (8) (E) panel antennas (3 at sectors A and C, 2 sector B)- Remove (3) (E) RRUS-11 B5, (1) per sector- Install (9) (N) panel atennas (3 per sector)- Install (N) 2' stand-off arm at sector "B"Equipment Level:- Remove (1) (E) DUW30- Remove (1) (E) Alpha Power plant with (6) rectifiers- Relocate (2) (E) 180AH string batteries fron (N) DC power plant- Install (1) (N) Netsure 7100 DC powe
PROPOSED TECCO MESH AND ROCK ANCHORS FOR SLOPE STABILIZATION
MODIFY EXISTING WIRELESS FACILITY. REMOVE AND REPLACE ANTENNAS ANDD RRUS. ZA-2013-1957 (CUW).
eplan. a new Steel Equipment Platform.(supplemental to: 20020-10000-01671)
Greek Theater voluntary seismic upgrade, retrofit & alteration of the north and south terrace seating decks (grandstands).- Relocate and raise ADA seat locations to meet sightline requirements.- Update and extend the existing wheelchair ramp to meet code requirements.- New perimeter railings for north and south terrace decks.- New seating for north and south terrace decks.
Installation of telecom equipment. New demising walls and finishes in equipment rooms. (N) steel frame attached to the rear of (E) building with (N) panel antennas.
EXTERIOR AND INTERIOR REMODEL FOR ROOF, RESTROOM. see comment.