1002 W CHILDS WAY, Los Angeles, CA 90089 · Los Angeles · 16 total events
Call
Eplan. Supplemental permit to 24016-20000-38049 for revision to fan coil unit support.
ePlan.Remodel (E) equipment room with new duct. and equipment
Supplemental to 22016-20003-37593 Seismic Bracing for overhead conduit racks and cable tray only. This addendum is to address areas that require rigid bracing instead of cable bracing due to field conditions.
EPLAN SUPPLEMENTAL PERMIT TO 22016-20000-37645 TO REVISE SEISMIC BRACING DETAIL TO CAPTURE RIGID SEIMIC BRACING IN PLACE OF CABLE SEIMIC BRACING.
EPLANATTN: JOE VO Seismic Bracing for our electrical overhead conduit racks and cable tray only. This revision is to include the added shell space for LAB 140 that is approximately 1400 Sq. feet.
DEFERRED SUBMITTAL FOR 22016-20000-37645 FOR SEISMIC BRACING FOR OVERHEAD CONDUIT RACKS AND CABLE TRAY ONLY.
Deffered Submittal ref 22016-20000-37593 for the Seismic Bracing for our overhead conduit racks and cable tray only.
ePlan RENOVATION AT (E) LABORATORY AT 1ST FLOOR, NORTH LAB SPACE ONLY..
LABORATORY RENOVATION IN EXISTING MCB BUILDING, LIMITED TO SOUTH LAB SPACE, FIRST FLOOR ONLY, APPROX. 8800SF ( ALL ROOMS GENERAL LAB SPACE B OCCUPANCY, THERE ARE NO HIGH HAZARD OCCUPANCIES IN SCOPE OF THIS PROJECT). OCCUPANCY UNCHANGED FROM BASE BLDG.
SUPPLEMENTAL PERMIT TO 19016-10000-22441: ADD MORE EQUIPMENT AND TOOL ANCHORAGE IN THE BASEMENT LEVEL.
SUPPLEMETNAL PERMIT TO 20016-10000-02610 TO ADD A NEW DOOR AT NORTH ENTRANCE.
supplemental to 20016-10000-11342 to revise the structural plans
TENANT IMPROVEMENT FOR NEW LAB IN EXISTING BUILDING INCLUDING SEISMIC ANCHORAGE FOR NEW EQUIPMENT
NEW EQUIPEMNT AT EXTERIOR OF BUILDING OVER (E) BASEMENT. INTERIOR REMODEL PORTION OF EXISTING BASEMENT AREA FOR NEW MRI (MAGNETIC RESONANCE IMAGING) SUITE. SCOPE OF WORK TO INCLUDE NEW FLOORING, WALL BASE, PAINT , NEW CEILING, LIGHTS, HVAC, POWER FOR NEW MRI AND CHILLER, NEW H.C. TOILET ROOM, AND H.C. DRESSING AREA.
USC UNIVERSITY PARK CAMPUS. Tenant Improvement include buill out of north and south shell spaces into new research spaces, offices, and open write up areas. New interior walls, glazing, doors, equipment and casework associated with MEP work. No added SF. No change of use, occupancy or parking.