6243 E OAK CREST WAY, Los Angeles, CA 90042 · Los Angeles · 4 total events
GENERAL
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing __22____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b) 2B."COMPLY WITH DEPARTMENT ORDER effective date09/2
17-6" x 7-2" Addition of full bathroom and closet to (e) SFD. Convert (e) bathroom to laundry room and remodeling the kitchen."COMPLY WITH DEPARTMENT ORDER effective date09/25/2019. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE".
Bulky Items