2212 W LOVELAND DR, Los Angeles, CA 90065 · Los Angeles · 5 total events
1 bathroom remodel for residential buildings (no structural changes). combined with m,e,p"COMPLY WITH DEPARTMENT ORDER effective date07/09/2018.
Bathroom (1) remodel for residential buildings (no structural changes). Replace drywall (no new walls added) for single family dwellings and duplexes only.
(3) Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150(b) 1B of Title 24. "COMPLY WITH DEPARTMENT ORDER effective date07/09/2018. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE".
(3)Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 152(b) of Title 24
GENERAL