400 S HOPE ST, Los Angeles, CA 90071 · Los Angeles · 33 total events
Self Service
Call
Self Service
Call
ePlan: Tenant Improvements include the demolishing of non-structural ceilings, interior finishes and lighting systems. New construction will consist of non-structural ceiling soffits and new finishes throughout. All new or revised HVAC, electrical, plumbing and life safety work will be design-build and submitted for permit separately. Building is fully sprinklered.
Self Service
EARLY START NON-STRUCTURAL INTERIOR DEMOLITION OF (E) OFFICE SPACE.
ePlan. supplemental permit to approved 23016-10000-16039 for revisions to Room Catering/Storage 1862 to add built in millwork with a pantry sink in lieu of the permitted stainless steel counters and 3-compartmentsink. Changes to millwork, plumbing and electrical. No changes to walls, ceilings or egress.
Supplemental permit to #23016-10000-16041 for revisions to Room Satellite Catering Pantry 1982 to add built in millwork with a pantry sink in lieu of the permitted stainless-steel counters.
EPLAN Supplemental permit to approved 23016-10000-16039 for Level 18 To allow for access controlled elevator lobby doors at existing freight elevator per LABC 1010.1.9.13Access-Controlled Elevator Lobby Doors in High Rise Office Buildings.
Supplemental permit to 22016-10000-36017 Enlarge opening of stair at the 19th floor
TENANT IMROVEMENT TO EX. OFFICE. 18TH FLOOR BATHROOM RENOVATION.
ePlanFULL FLOOR TENANT IMPROVEMENT ON 18TH FLOOR; INCLUDES NEW OPENING IN FLOOR FOR SINK.
TENANT IMPROVEMENT ON 19TH FLOOR; INCLUDES NON-BEARING PARTITIONS, MILLWORK, CEILING SYSTEMS WITH NEW LIGHTING, DOORS & FRAMES, POWER AND COMMUNICATION, FURNITURE SYSTEMS, WALL AND FLOOR FINISHES AND NEW OPENING FOR SINK.
ePlanFULL FLOOR TENANT IMPROVEMENT ON 16TH FLOOR; INCLUDES NEW FLOOR OPENING FOR SINK.
ePlan - FULL FLOOR TENANT IMPROVEMENT ON 17TH FLOOR;
EPLAN: TENANT IMPROVEMENT TO (E) OFFICE BUILDING LEVEL 17 TO MAKE RESTROOMS ADA COMPLIANT.
eplan EARLY START DEMOLITION OF NON-BEARING PARTITIONS, CEILINGS, LIGHT FIXTURES, MILLWORK, DOORS & FRAMES, FLOOR & WAL FINISHES FOR FULL FLOOR, Level 18
RENOVATION OF EXISTING OFFICE (B OCCUPANCY) TO ADD NEW CONVENIENCEINTERCONNECTING STAIR FROM LEVEL 16 UP TP LEVEL 19. NEW STAIR FINISHES AND GLASSGUARDRAIL. DEMOLITION OF EXISTING STRUCTURAL DECK FOR NEW STAIR OPENING.
eplan: INTERIOR EARLY START NON-STRUCTURAL DEMOLITION PERMIT TO (E) 19TH FLOOR OF OFFICE BUILDING.
EpLAN DEMOLITION OF EXISTING CONVENIENCE STAIR CONNECTING LEVELS 15 & 16, NEW RATED STRUCTURAL FLOOR INFILL AT STAIR OPENING BETWEEN LEVELS 15 & 16, AND PATCHING OF EXISTING FINISHES.
Single Streetlight Issue
EARLY START INTERIOR DEMO TO (E) OFFICE ON 7TH FLOOR.
Tenant improvement to (E) office at 11th and 12th floors (ste. 1150 and 1200). Revise breakroom and adding card readers. New partitions at elevator lobby.
Graffiti Removal
Graffiti Removal
Single Streetlight Issue
Single Streetlight Issue
Single Streetlight Issue
Single Streetlight Issue
Single Streetlight Issue
Single Streetlight Issue
Single Streetlight Issue